Estimating for builders and surveyors
Estimating for Builders and Surveyors; Copyright; Contents; Author's note; Preface; Note; 1 Introduction; The UK construction industry; Introduction to estimating; The invitation to tender; The estimating method; Tender procedure; Negotiated tender; Selective tendering for design and build; 2 T...
Gespeichert in:
1. Verfasser: | |
---|---|
Weitere Verfasser: | , |
Format: | UnknownFormat |
Sprache: | eng |
Veröffentlicht: |
Oxford
Butterworth Heinemann
2003
|
Ausgabe: | Second edition |
Schlagworte: | |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Estimating for Builders and Surveyors; Copyright; Contents; Author's note; Preface; Note; 1 Introduction; The UK construction industry; Introduction to estimating; The invitation to tender; The estimating method; Tender procedure; Negotiated tender; Selective tendering for design and build; 2 The cost of labour; The all-in hourly rate; The Working Rules; Estimating the cost of labour; Entitlement to basic and additional rates of pay; Work in difficult conditions; Bonus; Working hours; Overtime; Daily fare and travel allowance; Rotary shift working; Night work; Continuous working; Tide work Tunnel workRefuelling, servicing, maintenance and repairs; Storage of tools; Loss of clothing; Transfer arrangements; Subsistence allowance; Periodic leave; Guaranteed minimum weekly earnings; Annual holidays; Sick pay; Benefit schemes; Scaffolders; Employer's Contributions for National Insurance; Employer's liability insurance; Construction Industry Training Board levy; Redundancy funding; Supervision: foremen, chargehands, gangers; Bonus, incentive and productivity schemes; Excess overtime allowance; Practical estimating; 3 Mechanical plant; Introduction; Purchase or hire?; The plant rate DepreciationLife of plant; Hours worked per annum; Repairs and renewals; Tracks and tyres; Inflation; Summary; 4 Preliminaries; Introduction; Project particulars; Tender and contract documents; The site/existing buildings; Description of the works; The contract/sub-contract; Employer's requirements; Contractor's cost items; Nominated subcontractors; Provisional work items; Dayworks; Collection of example costs; 5 Excavation and filling; Site preparation; Lifting turf for preservation; Excavation: general remarks; Hand excavation; Depth and throw; Soil conditions; Outputs; Machine excavation Ground waterServices; Breaking out; Working space; Earthwork support; Disposal of water; Disposal of excavated material; Filling to excavations; Surface packing; Surface treatments; 6 Concrete work; In situ concrete; Materials; Weights and volumes; Shrinkage in concrete mix; Costing for shrinkage; Mixer costs; Labour costs; Reinforcement for in situ concrete; Formwork; Precast concrete; 7 Brickwork and blockwork; Introduction; Mortar; Bricks per wall area; Labour costs; Common brickwork; Brickwork sundries; Facing brickwork; Jointing and pointing; Special brickwork; Blockwork; 8 Underpinning IntroductionShoring; Underpinning; 9 Roof coverings; Slate roofing; Tile roofing; Clay plain roof tiles; Concrete roofing tiles; Lead sheet coverings and flashings; Fixing accessories for external leadwork; 10 Asphalt work; Introduction; Plant; Materials; Labour; Wastage; Building-up rates; 11 Woodwork carpentry: first fixings; Special requirements; Timber sizes and costs; Fastenings and adhesives; Labour constants; Examples of rates calculation; 12 Woodwork joinery: second fixings and finishings; Introduction; 13 Structural steelwork and metalwork; Introduction Isolated structural metal members (G12) |
---|---|
Beschreibung: | Hier auch später erschienene, unveränderte Nachdrucke |
Beschreibung: | ix, 310 Seiten |
ISBN: | 9780750642712 978-0-7506-4271-2 |