Reliability Analysis of NMR Systems under Random Shocks
|
1982 |
Mine, Hisashi |
Reliability Improvement of Constant Speed Drive for B-747 Aircraff
|
1982 |
Fukasawa, Kazutaka |
RF Transistor Amplifier Reliability
|
1982 |
Tanaka, Tadaaki |
Reliability Activity on Production of Electronic Key Telephone System
|
1982 |
Orii, Yoshihiko |
Configuration Control of Purchased Electronic Components
|
1982 |
Matsuura, Yoshiki |
Reliability Evaluation of Solar Array Panel for Engineering Test Satellite III
|
1982 |
Kuwajima, Saburo |
Simple Estimation Method for Weibull Parameters in the Competing Risk Model
|
1982 |
Kanie, Hisashi |
Integrated Inspection
|
1982 |
Suzuki, Yoshihisa |
A Study of Soldering Strength in Thick-Film Integrated Circuit
|
1982 |
Tsukihara, Yasuhisa |
An Optimal Inspection and Replacement Problem with Incomplete Monitoring
|
1982 |
Ohnishi, Masamitsu |
A Reliability Control Approach for Industrial Computer Control Software
|
1982 |
Sasaki, Okitsugu |
The Goal and Management of Software Reliability
|
1982 |
Tanahashi, Keitaro |
Job-Related Reliability Analysis for General Fault-Tolerant Systems
|
1982 |
Mine, Hisashi |
System Effectiveness for a Surface to Air Missile System
|
1982 |
Saito, Shiro |
Reliability Improvement and Evaluation Report for YS-11 Aircraft
|
1982 |
Koizumi, Hideo |
Improvement of Reliability of Microprocessor-Controller in Room Air Conditioner
|
1982 |
Ide, Yuuichi |
Torsional Strength Design of Carbon Fiber Reinforced Plastic Parts for Automobile Power Plants
|
1982 |
Kawamoto, Hiroshi |
Reliability Assurance Activity in Production Stage of Electronic Equipment
|
1982 |
Takizawa, Norio |
A Computer Aided Error-Check Method for the Reliability-Design of Mos-Lsi in Developmental Stage
|
1982 |
Takakura, Koichi |
Simplified Optimal Selection Methods of Failure and Repair Rates of Units for the System (2)
|
1982 |
Kuwabara, Yasuo |