Control chart for high-quality processes based on Six Sigma quality
|
2017 |
Joghee, Ravichandran |
Computations of the signature reliability of the coherent system
|
2017 |
Kumar, Akshay |
Optimal (N, F) policy for queue-dependent and time-sharing machining redundant system
|
2017 |
Shekhar, Chandra |
Availability and cost analysis of an engineering system involving subsystems in series configuration
|
2017 |
Kumar, Anuj |
Evaluation and prioritization of service quality dimensions based on gap analysis with analytic network process
|
2017 |
Dabestani, Reza |
Safety management system in automotive and energy industries
|
2017 |
Kongkiti Phusavat |
Quality management and customer results : the tourist accommodation sector in Spain
|
2017 |
Álvarez-García, José |
Z and W charts for controlling service processes
|
2017 |
Requeijo, José Gomes |
Six Sigma DMAIC project to improve the performance of an aluminum die casting operation in Portugal
|
2017 |
Albuquerque Marques, Pedro Alexandre de |
A structural equation model for evaluating the relationship between total quality management and employees' productivity
|
2017 |
Putri, Nilda Tri |
Mixed two- and four-level experimental designs for interchangeable parts with different degrees of assembly difficulty
|
2017 |
Vivacqua, Carla A. |
Exploring research on quality and reliability management through text mining methodology
|
2017 |
Carnerud, Daniel |
A conceptual continuous improvement implementation framework for UK manufacturing companies
|
2017 |
McLean, Richard |
Analyzing the causes of delay in development projects by fuzzy analysis
|
2017 |
Ghiasi, Vahed |
A standard proposal for biological resources centres
|
2017 |
Silva, Anabela Martins |
Analysis of training programs related to quality management system : the Spanish case
|
2017 |
Petnji Yaya, Luc Honore |
Implementation of ISO 9001 in the Spanish tourism industry
|
2017 |
Djofack, Sidonie |
Knowledge management and total quality management : reciprocal relationship
|
2017 |
Amir Honarpour |
Stochastic modelling of a wind electric generating power plant : performance under multi-approaches
|
2017 |
Goyal, Nupur |
ISO 9001 and ISO/IEC 17025: which is the best option for a laboratory of metrology? : the Portuguese experience
|
2017 |
Barradas, José |