A risk integrated methodology for project planning under uncertainty

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Essays in production, project planning and scheduling
1. Verfasser: Herroelen, Willy S. (VerfasserIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2014
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Hybrid flow shop scheduling with availability constraints 2014 Allaoui, Hamid
Vulnerability discussion in multimodal freight systems 2014 Aydin, Saniye Gizem
Multiple-lot lot streaming in a two-stage assembly system 2014 Yao, Liming
Refined EM method for solving linearly constrained global optimization problems 2014 Yu, Lu
Integrated production planning and pricing decisions in congestion-prone capacitated production systems 2014 Upasani, Abhijit
Scheduling and financial planning in stochastic activity networks 2014 Dodin, Bajis M.
Multimode resource-constrained project scheduling problem including multiskill labor (MRCPSP-MS) model and a solution method 2014 Santos, Mónica A.
A risk integrated methodology for project planning under uncertainty 2014 Herroelen, Willy S.
The price of anarchy for a network of queues in heavy traffic 2014 Stidham, Shaler
Ubiquitous operations research in production systems 2014 McGinnis, Leon F.
Mine planning above and below ground : generating a set of pareto-optimal schedules considering risk and return 2014 McFadden, Carson
A probabilistic characterization of allocation performance in a worker-constrained job shop 2014 Lobo, Benjamin J.
Dynamic resource constrained multi-project scheduling problem with weighted earliness/tardiness costs 2014 Pamay, M. Berke
A comparative study of procedures for the multinomial selection problem 2014 Tollefson, Eric
Alle Artikel auflisten