Control chart for high-quality processes based on Six Sigma quality
|
2017 |
Joghee, Ravichandran |
Computations of the signature reliability of the coherent system
|
2017 |
Kumar, Akshay |
Optimal (N, F) policy for queue-dependent and time-sharing machining redundant system
|
2017 |
Shekhar, Chandra |
Availability and cost analysis of an engineering system involving subsystems in series configuration
|
2017 |
Kumar, Anuj |
Evaluation and prioritization of service quality dimensions based on gap analysis with analytic network process
|
2017 |
Dabestani, Reza |
Safety management system in automotive and energy industries
|
2017 |
Kongkiti Phusavat |
Quality management and customer results : the tourist accommodation sector in Spain
|
2017 |
Álvarez-García, José |
Z and W charts for controlling service processes
|
2017 |
Requeijo, José Gomes |
Six Sigma DMAIC project to improve the performance of an aluminum die casting operation in Portugal
|
2017 |
Albuquerque Marques, Pedro Alexandre de |
A structural equation model for evaluating the relationship between total quality management and employees' productivity
|
2017 |
Putri, Nilda Tri |
Mixed two- and four-level experimental designs for interchangeable parts with different degrees of assembly difficulty
|
2017 |
Vivacqua, Carla A. |
Exploring research on quality and reliability management through text mining methodology
|
2017 |
Carnerud, Daniel |
A conceptual continuous improvement implementation framework for UK manufacturing companies
|
2017 |
McLean, Richard |
Analyzing the causes of delay in development projects by fuzzy analysis
|
2017 |
Ghiasi, Vahed |
Portuguese primary healthcare : sustainability through quality management
|
2017 |
Silva, Sónia Duarte |
The X-bar control chart with restriction of the capability indices
|
2017 |
Oprime, Pedro Carlos |
Maintainability analysis in shaving blades industry : a case study
|
2017 |
Tsarouhas, Panagiotis |
Quantitative analysis of Six Sigma, Lean and Lean Six Sigma research publications in last two decades
|
2017 |
Shokri, Alireza |
The four Rs performance indicators of water distribution networks : a review of research literature
|
2017 |
Gunawan, Indra |
Optimum modified ramp-stress ALT plan with competing causes of failure
|
2017 |
Srivastava, Preeti Wanti |