Project scheduling with flexible resources formulation and inequalities

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:OR spectrum
1. Verfasser: Correia, Isabel (VerfasserIn)
Weitere Verfasser: Lourenço, Lídia Lampreia (VerfasserIn), Saldanha-da-Gama, Francisco (VerfasserIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2012
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Simultaneous lotsizing and scheduling considering secondary resources : a general model, literature review and classification 2019 Wörbelauer, Martin
A worker constrained flexible job shop scheduling problem with sequence-dependent setup times 2019 Kress, Dominik
Organ transplantation logistics : a case for Turkey 2019 Savaşer, Sinem
Decision making in multiobjective optimization problems under uncertainty : balancing between robustness and quality 2019 Zhou-Kangas, Yue
Capacitated ring arborescence problems with profits 2019 Hill, Alessandro
Route feasibility testing and forward time slack for the synchronized pickup and delivery problem 2019 Gschwind, Timo
The train-to-yard assignment problem 2019 Otto, Alena
Integration methods for aircraft scheduling and trajectory optimization at a busy terminal manoeuvring area 2019 Samà, Marcella
Motion and layout planning in a grid-based early baggage storage system : heuristic algorithms and a simulation study 2019 Yalcin, Altan
A cross-bargaining game approach for direction selection in the directional distance function 2019 Wei, Fangqing
A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand 2019 Briskorn, Dirk
Dynamic directional nonparametric profit efficiency analysis for a single decision-making unit : an aggregation approach 2019 Walheer, Barnabé
Dual-mode inventory management under a chance credit constraint 2019 Chen, Qiushi
Analysis of a fork/join station with inputs form a finite population subnetwork with multi-server stations 2019 Goosens, Nico
Bi-criteria path problem with minimum length and maximum survival probability 2019 Halman, Nir
Controlling distribution conveyors and multiline palletizers : theoretical foundations and online algorithms 2019 Gurski, Frank
Identifying efficient solutions via simulation : myopic multi-objective budget allocation for the bi-objective case 2019 Branke, Juergen
Allocation planning in sales hierarchies with stochastic demand and service-level targets 2019 Kloos, Konstantin
Model formulations for the capacitated lot-sizing problem with service-level constraints 2019 Stadtler, Hartmut
Production control with price, cost, and demand uncertainty 2019 Tan, Barış
Alle Artikel auflisten