Forewarning for urban sustainable development based on fuzzy matter element model taking Nan Tong City for example

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Modeling risk management in sustainable construction
1. Verfasser: Zhang, Wen-jin (VerfasserIn)
Weitere Verfasser: Tang, De-shan (VerfasserIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2011
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Investment cost analysis for key industries of new energy based on Boston Experience Curve 2011
The study of green risk assessment for construction project based on "AHP-FCE" method 2011 Xie, Danfeng
Modeling the out-of-stock risk and the EOQ-JIT cost indifference point 2011 Wu, Min
Sensitivity analysis for the relationship between toll rate and traffic volume for freeway 2011 Wei, Lian-yu
Study on prophase risk management in informatization of Chinese construction enterprises 2011 Luo, Fu-zhou
The Gerber-Shiu discounted penalty function for the credit risk model with dependent rates of interest 2011 Peng, Dan
Analysis on structure risk and its countermeasures of international trade corridor in inland China 2011
Asphalt pavement surface penetrate rejuvenate restore technology : application and evaluation 2011 Guo, Xiaohong
Resident population prediction based on cohort-component method 2011 Lv, Biyu
Influence of perceived risk and service recovery on on-line shopping : a dynamic game of incomplete information 2011 Fang, Yong
Traffic risk assessment of freeway on-ramp and off-ramp areas based on simulation analysis 2011 Yan, Ying
Eco-efficiency assessment for the eco-industrial park based on the emergy analysis 2011 Shang, Hua
Research on appraisal of high-tech entrepreneurial risk based on osculating value method 2011 Wang, Yan-rong
A study of construction project conflict management based on evolutionary game theory 2011 Ding, Jie
An improved approach for supplier selection in project material bidding procurement 2011 Xu, Maozeng
A quantitative analysis for degree of supplier involvement under market uncertainty 2011 Zhang, Zi-jian
The application of dynamic priority of AHP on operation risk assessment of metro 2011 Gao, Yunhao
Study on construction project bidding risk assessment model 2011 Wen, Guofeng
Multi-criteria decision model for BOT project selection 2011 Yan, Min-ren
Equitable risk allocation in Chinese Public-Private Partnership power projects 2011 Ke, Yongjian
Alle Artikel auflisten