Equitable risk allocation in Chinese Public-Private Partnership power projects

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Modeling risk management in sustainable construction
1. Verfasser: Ke, Yongjian (VerfasserIn)
Weitere Verfasser: Wang, Shouqing (VerfasserIn), Chan, Albert P. (VerfasserIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2011
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Eco-efficiency assessment for the eco-industrial park based on the emergy analysis 2011 Shang, Hua
Research on appraisal of high-tech entrepreneurial risk based on osculating value method 2011 Wang, Yan-rong
A study of construction project conflict management based on evolutionary game theory 2011 Ding, Jie
An improved approach for supplier selection in project material bidding procurement 2011 Xu, Maozeng
A quantitative analysis for degree of supplier involvement under market uncertainty 2011 Zhang, Zi-jian
The application of dynamic priority of AHP on operation risk assessment of metro 2011 Gao, Yunhao
Study on construction project bidding risk assessment model 2011 Wen, Guofeng
Multi-criteria decision model for BOT project selection 2011 Yan, Min-ren
Equitable risk allocation in Chinese Public-Private Partnership power projects 2011 Ke, Yongjian
Analysis of the equipment's maintenance periods under different operation stages 2011 Chi, Jie
A study on management risk evaluation system of large-scale complex construction projects 2011 Xie, Linlin
Risk-based determination of the premium rate of construction work safety liability insurance 2011 Wang, Hongxia
Application of industrialized housing system in China : a Chongqing study 2011 Pan, Yuhong
The study on energy consumption and pollutant emission of civil vehicles in Beijing 2011 Zhao, Li-xiang
Green adaptive reuse : issues and strategies for the built environment 2011 Langston, Craig A.
Intensive land use evaluation of urban development zones : a case study of Xi'an national hi-tech industrial development zone in China 2011 Xiao, Wei
A risk-sensitivity analysis on NPV model of investment projects 2011 Qin, Xiansheng
An approach to overseas iron ore investment risk assessment based on fuzzy neural network 2011 Guo, Li
Study on the management mechanism of emergency telecommunication in China 2011 Jin, Zhenyu
Forewarning for urban sustainable development based on fuzzy matter element model : taking Nan Tong City for example 2011 Zhang, Wen-jin
Alle Artikel auflisten