Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Annals of operations research
Weitere Verfasser: Grobler, Jacomine (BerichterstatterIn), Engelbrecht, Andries P. (BerichterstatterIn), Kok, Schalk (BerichterstatterIn), Yadavalli, Sarma (BerichterstatterIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2010
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Summary of András Prékopa's scientific contributions 2012
Optimal risk sharing with general deviation measures 2012 Grechuk, Bogdan
Pattern definition of the p-efficiency concept 2012 Lejeune, Miguel A.
Polynomial bases on the numerical solution of the multivariate discrete moment problem 2012 Mádi-Nagy, Gergely
On computing optimal (Q,r) replenishment policies under quantity discounts : the all-units and incremental discount cases 2012 Katehakis, Michael N.
Aggregation of ordinal data using ordered weighted averaging operator weights 2012 Ahn, B. S.
Scheduling incoming and outgoing trucks at cross docking terminals to minimize the storage cost 2012 Sadykov, Ruslan
Stability of a spatial polling system with greedy myopic service 2012 Leskelä, Lasse
Approximation and contamination bounds for probabilistic programs 2012 Branda, Martin
A stochastic model for the daily coordination of pumped storage hydro plants and wind power plants 2012
HMM based scenario generation for an investment optimisation problem 2012 Erlwein, Christina
Multi-resource allocation in stochastic project scheduling 2012 Wiesemann, Wolfram
Functionality defense through diversity : a design framework to multitier systems 2012 Wang, Jingguo
Improving the computational efficiency in a global formulation (GLIDE) for interactive multiobjective optimization 2012 Ruiz, Francisco
Genetic algorithm-based multi-criteria project portfolio selection 2012
Robust optimization analysis for multiple attribute decision making problems with imprecise information 2012 Wang, Jiamin
Combined DEMATEL technique with hybrid MCDM methods for creating the aspired intelligent global manufacturing & logistics systems 2012 Tzeng, Gwo-hshiung
Special section: OR in medicine and health care 2012
New algorithms and complexity status of the reducibility problem of sequences in open shop scheduling minimizing the makespan 2012 Andresen, Michael
The average tree solution for multi-choice forest games 2012
Alle Artikel auflisten