Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:European journal of industrial engineering
1. Verfasser: Valente, Jorge M. S. (VerfasserIn)
Weitere Verfasser: Schaller, Jeffrey E. (VerfasserIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2010
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Economic-statistical design of EWMA-semicircle charts under the Taguchi loss function 2019 Lu, Shin-Li
A new right-skewed loss function in process risk assessment 2019 Köksoy, Onur
Supply chains competition with vertical and horizontal information sharing 2019 Chen, Zhaobo
A blood distribution problem with new transportation options : an application for the Turkish Red Crescent 2019 Kurt, Atıl
A queuing system with inventory and competing suppliers 2019 Saffari, Muhammad
Prioritisation and assessment of leagile manufacturing enablers using interpretive structural modelling approach 2019 Virmani, Naveen
Modelling and optimising the multi-item stochastic joint replenishment problem with uncertain lead-time and controllable major ordering cost 2019 Ai, Xue-Yi
Compromised supply chain planning under dominant systems with inventory policies and cost uncertainty 2019 Chatdanai Kaorapapong
One approach to evaluate the influence of engeneering characteristics in QFD method 2019 Parezanović, Tanja
A continuous review (s, S) inventory system with postponed demands at service facility 2019 Jenifer, J. Sebastian Arockia
Scheduling TV advertisements via genetic algorithm 2019 Czerniachowska, Kateryna
A bi-objective integrated model for the uncertain blood network design with raising products quality 2019 Samani, Mohammad Reza Ghatreh
A novel hierarchical approach for a heterogeneous 3D pallet loading problem subject to factual loading and delivery constraints 2019 Kır, Sena
Bi-objective scheduling on two dedicated processors 2019 Kacem, Adel
Investigating the performance improvement by conversion of assembly line configuration to a pure cell system in manufacturing industry 2019 Deepthi, T. Venkata
Characterisation and optimal design of a new double sampling c chart 2019 Campuzano, Manuel J.
Flowshop sequence-denpendent group scheduling with minimisation of weighted earliness and tardiness 2019 Keshavarz, Taha
An integrated model of statistical process control and maintenance planning for a two-stage dependent process under general deterioration 2019 Rasay, Hasan
Side-sensitive synthetic double sampling X̄ control charts 2019 Malela-Majika, Jean-Claude
Effect of supply disruption on inventory policy 2019 Chirakiat Saithong
Alle Artikel auflisten