Vendor-managed inventory and the effect of channel power

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:OR spectrum
1. Verfasser: Bichescu, Bogdan C. (VerfasserIn)
Weitere Verfasser: Fry, Michael J. (VerfasserIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2009
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Simultaneous lotsizing and scheduling considering secondary resources : a general model, literature review and classification 2019 Wörbelauer, Martin
A worker constrained flexible job shop scheduling problem with sequence-dependent setup times 2019 Kress, Dominik
Organ transplantation logistics : a case for Turkey 2019 Savaşer, Sinem
Decision making in multiobjective optimization problems under uncertainty : balancing between robustness and quality 2019 Zhou-Kangas, Yue
Bi-criteria path problem with minimum length and maximum survival probability 2019 Halman, Nir
Controlling distribution conveyors and multiline palletizers : theoretical foundations and online algorithms 2019 Gurski, Frank
Identifying efficient solutions via simulation : myopic multi-objective budget allocation for the bi-objective case 2019 Branke, Juergen
Allocation planning in sales hierarchies with stochastic demand and service-level targets 2019 Kloos, Konstantin
Model formulations for the capacitated lot-sizing problem with service-level constraints 2019 Stadtler, Hartmut
Production control with price, cost, and demand uncertainty 2019 Tan, Barış
Trolley line picking : storage assignment and order sequencing to increase picking performance 2019 Füßler, David Jörg
Heuristic algorithms for the single allocation p-hub center problem with routing considerations 2019 Kartal, Zühal
Robust resource-constrained max-NPV project scheduling with stochastic activity duration 2019 Liang, Yangyang
Assessment of the maintenance cost and analysis of availability measures in a finite life cycle for a system subject to competing failures 2019 Caballé, N. C.
Capacitated ring arborescence problems with profits 2019 Hill, Alessandro
Route feasibility testing and forward time slack for the synchronized pickup and delivery problem 2019 Gschwind, Timo
The train-to-yard assignment problem 2019 Otto, Alena
Integration methods for aircraft scheduling and trajectory optimization at a busy terminal manoeuvring area 2019 Samà, Marcella
Motion and layout planning in a grid-based early baggage storage system : heuristic algorithms and a simulation study 2019 Yalcin, Altan
A cross-bargaining game approach for direction selection in the directional distance function 2019 Wei, Fangqing
Alle Artikel auflisten