Heavy traffic analysis of a single vehicle loop in an automated storage and retrival system

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:OR spectrum
1. Verfasser: Xu, Dongsheng (VerfasserIn)
Weitere Verfasser: Shi, Ning (VerfasserIn), Cheung, Raymond K. (VerfasserIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2007
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Capacitated ring arborescence problems with profits 2019 Hill, Alessandro
Route feasibility testing and forward time slack for the synchronized pickup and delivery problem 2019 Gschwind, Timo
The train-to-yard assignment problem 2019 Otto, Alena
Integration methods for aircraft scheduling and trajectory optimization at a busy terminal manoeuvring area 2019 Samà, Marcella
Motion and layout planning in a grid-based early baggage storage system : heuristic algorithms and a simulation study 2019 Yalcin, Altan
A cross-bargaining game approach for direction selection in the directional distance function 2019 Wei, Fangqing
A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand 2019 Briskorn, Dirk
Dynamic directional nonparametric profit efficiency analysis for a single decision-making unit : an aggregation approach 2019 Walheer, Barnabé
Dual-mode inventory management under a chance credit constraint 2019 Chen, Qiushi
Analysis of a fork/join station with inputs form a finite population subnetwork with multi-server stations 2019 Goosens, Nico
Quantitative approaches in production management 2019 Helber, Stefan
Airport operations management : editorial 2019 Atkin, Jason
The recoverable robust stand allocation problem : a GRU airport case study 2019 Dijk, Bert
The cafeteria problem : order sequencing and picker routing in on-the-line picking systems 2019 Füßler, David
Prepositioning inventory for disasters : a robust and equitable model 2019 Velasquez, German A.
Designing capacity rollout plan for neonatal care service system in Korea 2019 Jang, Hoon
A machine learning approach for flow shop scheduling problems with alternative resources, sequence-dependent setup times, and blocking 2019 Benda, Frank
Flexible layouts for the mixed-model assembly of heterogeneous vehicles 2019 Hottenrott, Andreas
Time-constrained maximal covering routing problem 2019 Amiri, Afsaneh
An optimisation model for scheduling the decommissioning of an offshore wind farm 2019 Irawan, Chandra Ade
Alle Artikel auflisten