Proactive-reactive project scheduling trade-offs and procedures

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Perspectives in modern project scheduling
Weitere Verfasser: Van de Vonder, Stijn (BerichterstatterIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2006
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Proactive-reactive project scheduling trade-offs and procedures 2006
RCPS with variable intensity activities and feeding precedence constraints 2006 Kis, Tamás
Modelling setup times in project scheduling 2006 Mika, Marek
Resource constrained project scheduling; a hybrid neural approach 2006 Colak, Selcuk
A hybrid genetic algorithm based on intelligent encoding for project scheduling 2006 Alcaraz, Javier
Population learning algorithm for the resource-constrained project scheduling 2006 Jedrzejowicz, Piotr
CP-based decision support for project driven manufacturing 2006 Banaszak, Zbigniew A.
Resource constrained project scheduling models under random disturbances 2006 Golenko-Ginzburg, Dimitri
Due dates and RCPSP 2006 Ballestín, Francisco
Selection and scheduling of pharmaceutical research projects 2006 Kolisch, Rainer
A practical and accurate alternative to PERT 2006 Dodin, Bajis
Lower bounds for resource constrained project scheduling problem : recent advances 2006
Justification technique generalizations 2006 Valls, Vicente
A metaheuristic approach to the resource constrained project scheduling with variable activity durations and convex cost funtions 2006 Nonobe, Koji
Grid multicriteria job scheduling with resource reservation and prediction mechanisms 2006
Resource-constrained project scheduling with time windows: recent developments and new applications 2006 Neumann, Klaus
Alle Artikel auflisten