A practical approach to production scheduling

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Production and inventory management
1. Verfasser: Lee, Sang M. (VerfasserIn)
Weitere Verfasser: Moore, Laurence J. (VerfasserIn)
Format: UnknownFormat
Veröffentlicht: 1974
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
MRP and Kanban - a possible synergy? 1987 Belt, Bill
Flexible manufacturing systems : technology and advantages 1986 Gilbert, James P.
Automation technology : past, present, and future 1986 Wiley, David T.
Flexible manufacturing systems : an industry overview 1986 Snader, Kenneth R.
Are Japanese production methods applicable in the United States? 1985 Plenert, Gerhard
Protective scheduling smoothers jittery MRP plans : buffer forecast error in the key 1985 Lowerre jr., William M.
A variable demand lot-sizing procedure and a comparison with various well-known strategies 1985 Aucamp, Donald C.
Making MRP work in a multiplant environment 1985 O'Connor, James
MRP is none of the above 1985 Millard, Robert I.
How to achieve and maintain inventory accuracy 1985 Thompson, Richard L.
Kanban scheduling : Boon or bane? 1985 Wilson, Glenn T.
The early returns are in : MRP II 1985 Melnyk, Steven A.
Inventory carrying cost : theory and practice 1984 Gaither, Norman
Project plan charting : an effective alternative 1984 Krupp, James A. G.
Improving manufacturing performance : Management's vital challenge 1984 Burnham, John M.
The Japanese connection : imitate or emulate? 1984 Cooper, Carl
Strategic business planning 1982 Krupp, James A. G.
A heuristic for multiple resource constrained scheduling 1981 Plebani jr., Louis J.
Improve production planning with an inventory adjustment policy 1981 Ward, Edward E.
The effects of inflation and fuel scarcity upon inventory policies 1981 Gaither, Norman
Alle Artikel auflisten