The impact of capacity on lot sizing decisions
|
1979 |
Biggs, Joseph R. |
Variations in optimizing serial multi-stage production/inventory systems
|
1979 |
Szendrovits, Andrew Z. |
An approach to the analysis of integrated production-distridution systems
|
1979 |
Krauss, G. Howard |
Disaggregate mathematical models for optimal hospital bed management
|
1979 |
Esogbue, Augustine O. |
Nurse scheduling, a case of disaggregation in the public sector
|
1979 |
Miller, Holmes E. |
A public policy optimization model with simulation of disaggregation aspects, formulation of energy R and D policy
|
1979 |
Gorr, Wilpen L. |
Dissagregation planning, scheduling, and allocation of nursing staff
|
1979 |
Wolfe, Harry B. |
Optimal scheduling of two consecutive work periods
|
1979 |
Tibrewala, Rajen K. |
Impact of a product structure measure on the effectiveness of lot sizing techniques
|
1979 |
Goodman, Stephen H. |
A review of flowshop scheduling research
|
1979 |
Gupta, Jatinder N. D. |
Vehicle dispatching: sweep algorithm and extensions
|
1979 |
Gillet, Billy E. |
A simple method for obtaining cyclic emplioyee schedules
|
1979 |
Browne, James J. |
A hierarchical approach to multilocation inventory systems
|
1979 |
Karmarkar, Uday S. |
Toward a theory of hierarchical coordination and conflict
|
1979 |
Talavage, J. |
An MSA view of disaggregation
|
1979 |
Burnham, John M. |
Large scale optimization for master production scheduling
|
1979 |
Mangiameli, Paul M. |
Perspectives on disaggregation
|
1979 |
Starr, Martin K. |
The effects of joint size strategies on capacity related performance in a multi-stage production-inventory system
|
1979 |
Collier, David A. |
Shift scheduling for telephone operators and service office employees
|
1979 |
Cosgrove, Michael J. |
An economic lot size algorithm for multi-level inventory systems with acyclic network structures
|
1979 |
Darukhanavala, Phiroz P. |