Stability and optimal control of a multiplayer dynamic game

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Operations research proceedings 2000
1. Verfasser: Scheffran, Jürgen (VerfasserIn)
Pages:2000
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2001
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Cost flow improvement by upgrading costs and capacities 2001 Demgensky, Ingo
A problem of finding the maximal spanning connected subgraph with given vertex degrees 2001 Gimadi, Edward K.
Probabilistic tabu search algorithm for the multi-stage uncapacitated facility location problem 2001 Kochetov, Yuri A.
Prognosis, diagnosis and control of production by means of dynamic Bayesian networks 2001 Munkelt, Torsten
Optimization of the TEM-model : co-funding and joint international emissions trading 2001 Pickl, Stefan Wolfgang
R & D spillovers and absorptive capacity in a dynamic oligopoly 2001 Confessore, Giuseppe
Preentry advertising and entry deterrence 2001 Weinem, Michael
A heuristic approach for a multistage lotsizing problem with dynamic product structure 2001
Approximate optimal policies for a stochastic finite horizon one product recovery inventory model 2001 Kiesmüller, Gudrun
Extension of disjunctive graph model for job shop scheduling problem 2001 Błażewicz, Jacek
Minimizing total weighted tardiness on single batch process machine with incompatible job families 2001
Approximate solution of a time-dependent scheduling problem for lp-norm-based criteria 2001
Neue große Benchmarkprobleme für das Standardproblem der Tourenplanung mit Zeitfensterrestriktionen 2001 Homberger, Jörg
A dynamic environmental theory of production 2001 Dobos, Imre
Production planning of multi-product kanban systems with significant setup times 2001 Krieg, Georg N.
Zonenbildung in Hochregallagern bei beliebiger Lage der Übergabestellen am Regalrand 2001 Lippolt, Christian R.
Minimization of project-network with given bounds of activity durations 2001 Sotskov, Yuri N.
Calendars in project scheduling 2001 Trautmann, Norbert
Ants solve time constrained pickup and delivery problems with full truckloads 2001 Doerner, K. F.
Ein genetischer Algorithmus für ein dynamisches speditionelles Dispositionsproblem 2001 Pankratz, Giselher
Alle Artikel auflisten