Integration feasibility of the existing linac control system and the ring EPICS system at KEKB contributed to the international conference on accelwrator and large experimental physics control systems (ICALEPCS'95). Chicago, U.S.A., October 30 - November 3, 1995
Gespeichert in:
Weitere Verfasser: | |
---|---|
Format: | UnknownFormat |
Sprache: | eng |
Veröffentlicht: |
Ibaraki
National Laboratory for High Energy Physics
1996
|
Schriftenreihe: | KEK Preprint
95-202 |
Schlagworte: | |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Beschreibung: | 4 S graph. Darst |
---|