PPP Renegotiation Flight Simulator: A System Dynamics Model for Renegotiating PPPs after Pandemic Crisis

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Construction Research Congress (2022 : Arlington, Va.) Construction Research Congress 2022 ; Volume 3, volume 1 of 2
1. Verfasser: Castelblanco, Gabriel (VerfasserIn)
Weitere Verfasser: Guevara, Jose (VerfasserIn), Mendez-Gonzalez, Paula (VerfasserIn)
Pages:2022
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2022
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Precontract Negotiations in Design-Build Projects 2022 Erkal, Elif Deniz Oguz
Investigating Financial Risks Associated with Public-Private Partnerships for Transportation Project Delivery 2022 Joshi, Kalyani
Synthesis of Challenges for Public-Private Partnerships (PPPs) in Transportation Infrastructure in Southeast Asia 2022 Nguyen, Chi A.
Construction Procedural Information Extraction from Textual Sources to Support Scheduling 2022 Ren, Ran
Estimating Electricity Consumption of Buildings Using Information Theory and Machine Learning Methods 2022 Ghafoori, Mahdi
Improving the Efficiency of Rebar Manufacturing Works for Simultaneous Multiple Projects Using Discrete Event Simulation 2022 Hong, Eunbin
Benefits of Building Information Modeling in Road Proiects for Cost Overrun Factors Mitigation 2022 Sánchez, Omar
Cost Analysis of a Mass Timber Building Project: Comparison of Budgeted and Actual Construction Cost 2022 Ahmed, Shafayet
Life Cycle Cost Assessment of Green Lightweight Concrete Utilizing Recycled Plastic Based Lightweight Aggregates 2022 Algahtani, Fahad K.
PPP Renegotiation Flight Simulator: A System Dynamics Model for Renegotiating PPPs after Pandemic Crisis 2022 Castelblanco, Gabriel
Developing a Value Dashboard for Tracking Value Alignment during Design 2022 Khalife, Salam
Determining Contract Requirements for Quality Assurance Program in Innovative Project Delivery 2022 Lee, Jung Hyun
Predicting Ratio of Low Bid to Owner’s Estimate Using Feedforward Neural Networks for Highway Construction 2022 Li, Mingshu
Fairly Apportioning Concurrent Delay Liability: A Game Theory Approach 2022 Huynh, Huu T.
Identifying Contingency Liability from P3 Contracts Using Rule-Based NLP 2022 Wang, Yu
The Moderating Role of Trustworthiness in the Relationship between Institutional Distance and Private Ownerships in PPPs: Evidence from Emerging Markets and Developing Countries 2022 He, Qinghua
Enabling Faster Project Delivery through Use of Construction-Driven Designs 2022 Graff, Aleksandra Markovic
A Comparison of Georgia DOT’s Design-Build Legislation and Project Expenditures with Those of Bordering States 2022 Mitchell, Wesley D.
Determination of Optimal Rolling Planning Period for the Management of BIM-Based Construction Supply Chain Processes 2022 Chen, Qian
Machine Learning Framework to Predict Last Planner System Performance Metrics 2022 Shehab, Lynn
Alle Artikel auflisten