PS-3850: Utilizing Agile Work Methods in the Schedule Development Process

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AACE International (66. : 2022 : San Antonio, Tex.) 66th AACE International Conference & Expo 2022 ; Volume 2 of 2
1. Verfasser: Shakourifar, Abbas (VerfasserIn)
Pages:66
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2022
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
PS-3794: The Art of Scheduling 2022 Donado, Sylvia M.
PS-3854: Planning and Building a New Arena Under an Existing Roof 2022 Hallstrom, Zachary A.
RISK-3908: Risk Analysis and Contingency Estimating for Class 10 Estimates 2022 Hollmann, John K.
ITCM-3813: Proactive Cost Engineering Techniques to Avoid Common Project Failures 2022 Carson, Christopher W.
TCM-3825: An Organizational Change Journey - Fusing Project Controls, Lean Construction Principles & Technology for Fast-Track EPCM Pharmaceutical Projects 2022 Wolf, Britton L.
RISK-3826: Doing More with Less: A Data-Driven Approach to Resource Management 2022 Edson, Corey
RISK-3847: The Development of Corrected and Summarized Schedules to Support Monte Carlo Simulation 2022 Hulett, David T.
TCM-3934: The Project Life Cycle: Treatment and Control of Change 2022 Stephenson, H. Lance
PM-3796: An Adaptable and Comprehensive Project Assessment Tool 2022 Melamed, Dan
PM-3817: Governing for Success: Effective Project Governance for Megaprojects 2022 Ewida, Ahmed
PM-3865: Using Linear Programming to Create Optimal Budget Scenarios 2022 Doyle, Cadence
PM-3876: Bridge Over Troubled Waters: Challenges of Mid-Stream Project Management 2022 Sokoloski, Daniel
PS-3804: The Top Ten Worst Situations With Proven Project Controls Solutions 2022 Carson, Christopher W.
PS-3850: Utilizing Agile Work Methods in the Schedule Development Process 2022 Shakourifar, Abbas
RISK-3812: Choosing Between Strategic Alternatives Using Risk Analysis in Decision Modelling of Project Alternatives 2022 Hulett, David T.
RISK-3824: Calibration Assessments: Validation of Subjective Probabilities and Impact Ranges in Risk Analysis 2022 Moreno, Francisco Cruz
TCM-3933: The Project Life Cycle: Preventing Change and Project Failure 2022 Stephenson, H. Lance
PM-3830: A Standard WBS Proposition for Fixed Platforms Decommissioning in Brazil 2022 Muller, Leonardo
PM-3915: Construction Project Management Technology: Point Solutions vs. Integrated Platform Solutions 2022 Takacs, Natalie
PS-3805: Scheduling: Do You Have All the Puzzle Pieces 2022 Donado, Sylvia M.
Alle Artikel auflisten