DSAA-3798: Implementation of a Project Data Warehouse

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AACE International (66. : 2022 : San Antonio, Tex.) 66th AACE International Conference & Expo 2022 ; Volume 1 of 2
1. Verfasser: Vyskocil, Eric (VerfasserIn)
Pages:66
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2022
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
CDR-3868: Recommendations in Dealing with Disruptions and Loss of Productivity during Global Events (e.g. COVID-19 Pandemic)) 2022 Aziza, Khaled M.
CDR-3874: Termination for Convenience — What Is It? How Does It Work? What to Do? 2022 Zack, James G. Jr
CDR-3924: Project Documentation: Supporting Your 2022 Caddell, Christopher P.
CSC-3837: Advanced Work Packaging (AWP): An Introduction and Project Controls Guide for Implementation 2022 Karbowski, Ferdinand R. Jr.
CSC-3867: Leverage Innovative Technologies and Standardized Coding System for Real-Time Project Cost Control 2022 Xu, Jing
CSC-3869: Alternative KPIs in the Absence of Cost or Resource-Loading 2022 Majlessi-Kupai, Morvarid
EST-3845: Application of Parametric Models for Cost and Carbon (CO2) Footprint Estimating in Infrastructure Projects 2022 Chatzisymeon, Apostolos
OWN-3820: The Importance of Owner/Contractor Transparency Across All Contract Types 2022 Cabano, Stephen L.
CDR-3828: Complex Project Forensic Delay Analysis: Applying Multiple, Overlapping TIAs to Schedule Updates Through the Project Duration 2022 Smith, Becky
CDR-3790: Delay Claim Entitlement Under FIDIC Contracts 2022 Zhao, Tong
CDR-3829: Analyzing Delay When Owner-Provided Work Quantities Are Wrong 2022 Schwartzkopf, William C.
CDR-3921: Schedule Analysis without Schedules?! — Applying Earned Value Analysis in the Absence of Progress Updates 2022 Domingo, Rachel
CSC-3831: Advancing Project Management with Multi-Dimensional Project Controls and Digital Twin 2022 Barbarosoglu, Bahadir V.
DSAA-3816: Data Model for Advanced Data Analytics 2022 Tuladhar, Subhash
INT-3898: Construction Management Fee Model for Theme Park Project in China 2022 Zhang, Lan
EST-3860: Cost Growth in Early Stage NNSA Construction Projects: Root Cause Analysis 2022 Massey, Christopher J.
CDR-3877: Overtime and Loss of Productivity Claims 2022 Ibrahim, Hatem
CSC-3786: Improving Owner’s Cost Controls and Cost Optimization Practices Increase Profitability at NOC in the Covid Era 2022 Awoyomi, Johnson O.
CDR-3949: How to Discretely Identify Delay and Disruption 2022 Gonzales, Anthony J.
CSC-3791: Extra! Extra! Read All About It! The Schedule Narrative Tool 2022 Caldarera, Joseph V.