CSC-3869: Alternative KPIs in the Absence of Cost or Resource-Loading

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AACE International (66. : 2022 : San Antonio, Tex.) 66th AACE International Conference & Expo 2022 ; Volume 1 of 2
1. Verfasser: Majlessi-Kupai, Morvarid (VerfasserIn)
Weitere Verfasser: Elshazly, Mohamed A. (VerfasserIn)
Pages:66
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2022
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
CDR-3877: Overtime and Loss of Productivity Claims 2022 Ibrahim, Hatem
CSC-3786: Improving Owner’s Cost Controls and Cost Optimization Practices Increase Profitability at NOC in the Covid Era 2022 Awoyomi, Johnson O.
CDR-3949: How to Discretely Identify Delay and Disruption 2022 Gonzales, Anthony J.
CSC-3791: Extra! Extra! Read All About It! The Schedule Narrative Tool 2022 Caldarera, Joseph V.
DSAA-3814: Data Collection and Visualization for an Improved Analysis of Historical Project Data 2022 Schlott, Helge
EST-3792: Revamping an Organization’s Estimating ProCeSS 2022 Lofton, Waymon
EVM-3806: Taming Your Organization for Earned Value Management System (EVMS) 2022 Saifi, Abbas
OWN-3925: A Case Study in Saudi Arabia: Completion of Major Pipeline Project within Budget and Schedule Utilizing Multiple Contractors 2022 Mansour, Hassan A.
CDR-3868: Recommendations in Dealing with Disruptions and Loss of Productivity during Global Events (e.g. COVID-19 Pandemic)) 2022 Aziza, Khaled M.
CDR-3874: Termination for Convenience — What Is It? How Does It Work? What to Do? 2022 Zack, James G. Jr
CDR-3924: Project Documentation: Supporting Your 2022 Caddell, Christopher P.
CSC-3837: Advanced Work Packaging (AWP): An Introduction and Project Controls Guide for Implementation 2022 Karbowski, Ferdinand R. Jr.
CSC-3867: Leverage Innovative Technologies and Standardized Coding System for Real-Time Project Cost Control 2022 Xu, Jing
CSC-3869: Alternative KPIs in the Absence of Cost or Resource-Loading 2022 Majlessi-Kupai, Morvarid
EST-3845: Application of Parametric Models for Cost and Carbon (CO2) Footprint Estimating in Infrastructure Projects 2022 Chatzisymeon, Apostolos
OWN-3820: The Importance of Owner/Contractor Transparency Across All Contract Types 2022 Cabano, Stephen L.
CDR-3852: Validating Schedules to Conduct a Reliable Forensic Schedule Analysis 2022 Lunte, Jessica
CDR-3870: Progress is Best Measured One “Half-Step” At A Time 2022 Brasco, Christopher J.
CDR-3873: Identification of Concurrency Through Literal Theory or Functional Theory, Freedom in Selection, or Dictated by Project Considerations? 2022 Khademagha, Saeid
CDR-3895: Making Changes to the Schedule When Performing MIPs 3.3 and 3.4 2022 Nagata, Mark F.