CDR-3877: Overtime and Loss of Productivity Claims
|
2022 |
Ibrahim, Hatem |
CSC-3786: Improving Owner’s Cost Controls and Cost Optimization Practices Increase Profitability at NOC in the Covid Era
|
2022 |
Awoyomi, Johnson O. |
CDR-3949: How to Discretely Identify Delay and Disruption
|
2022 |
Gonzales, Anthony J. |
CSC-3791: Extra! Extra! Read All About It! The Schedule Narrative Tool
|
2022 |
Caldarera, Joseph V. |
DSAA-3814: Data Collection and Visualization for an Improved Analysis of Historical Project Data
|
2022 |
Schlott, Helge |
EST-3792: Revamping an Organization’s Estimating ProCeSS
|
2022 |
Lofton, Waymon |
EVM-3806: Taming Your Organization for Earned Value Management System (EVMS)
|
2022 |
Saifi, Abbas |
OWN-3925: A Case Study in Saudi Arabia: Completion of Major Pipeline Project within Budget and Schedule Utilizing Multiple Contractors
|
2022 |
Mansour, Hassan A. |
CDR-3868: Recommendations in Dealing with Disruptions and Loss of Productivity during Global Events (e.g. COVID-19 Pandemic))
|
2022 |
Aziza, Khaled M. |
CDR-3874: Termination for Convenience — What Is It? How Does It Work? What to Do?
|
2022 |
Zack, James G. Jr |
CDR-3924: Project Documentation: Supporting Your
|
2022 |
Caddell, Christopher P. |
CSC-3837: Advanced Work Packaging (AWP): An Introduction and Project Controls Guide for Implementation
|
2022 |
Karbowski, Ferdinand R. Jr. |
CSC-3867: Leverage Innovative Technologies and Standardized Coding System for Real-Time Project Cost Control
|
2022 |
Xu, Jing |
CSC-3869: Alternative KPIs in the Absence of Cost or Resource-Loading
|
2022 |
Majlessi-Kupai, Morvarid |
EST-3845: Application of Parametric Models for Cost and Carbon (CO2) Footprint Estimating in Infrastructure Projects
|
2022 |
Chatzisymeon, Apostolos |
OWN-3820: The Importance of Owner/Contractor Transparency Across All Contract Types
|
2022 |
Cabano, Stephen L. |
CDR-3852: Validating Schedules to Conduct a Reliable Forensic Schedule Analysis
|
2022 |
Lunte, Jessica |
CDR-3870: Progress is Best Measured One “Half-Step” At A Time
|
2022 |
Brasco, Christopher J. |
CDR-3873: Identification of Concurrency Through Literal Theory or Functional Theory, Freedom in Selection, or Dictated by Project Considerations?
|
2022 |
Khademagha, Saeid |
CDR-3895: Making Changes to the Schedule When Performing MIPs 3.3 and 3.4
|
2022 |
Nagata, Mark F. |