Insights on Project Performance from 500,000 Projects

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AACE International (67. : 2023 : Chicago, Ill.) 67th AACE International Conference & Expo 2023 ; Volume 1 of 2
1. Verfasser: Amratia, Dev (VerfasserIn)
Pages:67
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2024
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Optimization of Procurement in the Construction Industry: What Today’s Environment Has Taught Us 2024 Raynes, Robert
Leveraging BIM, Automation, and Machine Learning for Future Cost Assessment of Energy Conservation Measures 2024 Kusumadjaja, Patricia
Integration of BIM, CPM Schedule, Short Interval Planning, Schedule Animation, and Progress on Fast Track Projects 2024 Wolf, Britton L.
The Hybrid Earned Value Analysis– a Proxy for the Measured Mile 2024 Witters, Ryan N.
The Risk of Mitigation - A Case Study of the Impact of Contemporaneously Changing Logic 2024 Sadauskas, Brenton J.
Total Cost Claim Versus Global Claim in Construction Claims 2024 Zhao, Tong
Combining Equipment Production Analysis and Delay Analysis to Quantify Time and Cost Impacts 2024 McMillan, Michelle
The Schedule Delay Analysis for Subcontractors – Different by Necessity 2024 Bolyard, Charles E.
The Theory of Delay: Timing and Basis for Identifying and Measuring Delay 2024 Sanders, Mark C.
Best Practices in Implementing Emerging Technologies in Construction Controls 2024 Milner, Ben
Does Historical Data on Unique Government Nuclear Facilities Have an Expiration Date? 2024 Fatzinger, Robert G.
FY2022 Department of Energy Project Management Escalation Study for Capital Assets 2024 West, Matthew Zachary
Utilization of Internal Cost Benchmarking in EPC Bidding 2024 Chen, Mu
Fully Integrating Earned Value and CPM Schedule Analysis at a Causal Level – a New Analytical Approach 2024 Boyle, J. Gerard
5D Planning in Earthworks Mining Constructions in Hilly Topography 2024 Cuadra, Axel Franco Castro
Key Benefits of 4D BIM Scheduling Implementation in Oil & Gas Projects and the Challenges 2024 Baharom, Muhammad Azri Ahmad
Advanced Measured Mile Method Using GMM 2024 Ghandour, Wael El
Benefits for Dispute Boards with the Application of AACE International Recommended Practices 2024 Rosa, Luis Otavio
Schedule Updates Using Remaining Original Duration Versus Remaining Work Duration 2024 Long, Thomas C.
Maximizing Early Claims Resolution Success Through Contemporaneous Project Data Capture 2024 Glavitsch, Kristin