5D Planning in Earthworks Mining Constructions in Hilly Topography
|
2024 |
Cuadra, Axel Franco Castro |
Key Benefits of 4D BIM Scheduling Implementation in Oil & Gas Projects and the Challenges
|
2024 |
Baharom, Muhammad Azri Ahmad |
Advanced Measured Mile Method Using GMM
|
2024 |
Ghandour, Wael El |
Benefits for Dispute Boards with the Application of AACE International Recommended Practices
|
2024 |
Rosa, Luis Otavio |
Schedule Updates Using Remaining Original Duration Versus Remaining Work Duration
|
2024 |
Long, Thomas C. |
Maximizing Early Claims Resolution Success Through Contemporaneous Project Data Capture
|
2024 |
Glavitsch, Kristin |
Death by a Thousand Cuts: Cumulative Impact Claims
|
2024 |
Lenz, Colleen |
Construction Claim Workbook for Forensic Analysis
|
2024 |
Ghandour, Wael El |
Schedule Delay Analysis in a Multi-Prime Environment
|
2024 |
Wallwork, Joseph W. |
Controlling Small Projects
|
2024 |
Pulagam, Sudhakar R. |
Integrated Real-Time Location System Information and 3D Point Clouds for Object Localization Onsite Using Deep Neural Networks
|
2024 |
Bardareh, Hassan |
Data-Driven Schedule Risk Forecasting for Construction Mega-Projects
|
2024 |
Hovhannisyan, Vahan |
A Milestone in a Digital Transformation Journey: Implementation of ISO 19008 Taxonomy as Part of Chevron’s Cost Engineering Data Transformation
|
2024 |
Smith, Emily |
Using Case Based Reasoning to Improve Top-Down Estimate Accuracy
|
2024 |
Gransberg, Nils J. |
Project Code of Accounts – Enhanced by Adding Construction Or Environmental Remediation Industry Standards
|
2024 |
Clemmons, Corey |
Assessing Contractor Responsible Concurrency When Using MIP 3.3 – Can a Sensible Procedure Be Developed?
|
2024 |
Rider, Ronald J. |
BIM and VE Optimization for Construction Schedule and Cost Control
|
2024 |
Amoah, Kwame B. O. |
A Primer for Claims and Disputes
|
2024 |
Ciccarelli, John J. |
Forensic Delay Analysis of Disrupted Projects: An Alternative Approach Using System Dynamics
|
2024 |
Voigt, Alexander |
Assessing the Reasonableness and Reliability of CPM Schedules for Use in Forensic Schedule Analyses
|
2024 |
Celeste, Brian |