Assigning As-Planned Gains-Delays in MIP 3.4, Split Contemporaneous Period Analysis

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AACE International (67. : 2023 : Chicago, Ill.) 67th AACE International Conference & Expo 2023 ; Volume 1 of 2
1. Verfasser: Carson, Christopher W. (VerfasserIn)
Pages:67
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2024
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Pitfalls to Avoid When Quantifying Extended Field Office Overhead Costs 2024 Rai, Suleiman Al
Validating Change Order Requests for Forensic Analysis 2024 Carlson, David
Assigning As-Planned Gains-Delays in MIP 3.4, Split Contemporaneous Period Analysis 2024 Carson, Christopher W.
Legal Pitfalls of the "Windows" Delay Analysis Method 2024 Sayed, Ahmed Y. El
Field Overhead – Direct Or Indirect Cost and the Proper Use of NAVFAC Form 4330/43 2024 Florez, Nickolas
Lean Operating Systems – Project and Portfolio Management Data Visualization Using Integrated Reporting 2024 Blodgett, John W.
Insights on Project Performance from 500,000 Projects 2024 Amratia, Dev
Confronting Price Escalation and Volatility Issues with Construction Materials 2024 Opfer, Neil D.
Optimization of Procurement in the Construction Industry: What Today’s Environment Has Taught Us 2024 Raynes, Robert
Leveraging BIM, Automation, and Machine Learning for Future Cost Assessment of Energy Conservation Measures 2024 Kusumadjaja, Patricia
Integration of BIM, CPM Schedule, Short Interval Planning, Schedule Animation, and Progress on Fast Track Projects 2024 Wolf, Britton L.
The Hybrid Earned Value Analysis– a Proxy for the Measured Mile 2024 Witters, Ryan N.
The Risk of Mitigation - A Case Study of the Impact of Contemporaneously Changing Logic 2024 Sadauskas, Brenton J.
Total Cost Claim Versus Global Claim in Construction Claims 2024 Zhao, Tong
Combining Equipment Production Analysis and Delay Analysis to Quantify Time and Cost Impacts 2024 McMillan, Michelle
The Schedule Delay Analysis for Subcontractors – Different by Necessity 2024 Bolyard, Charles E.
The Theory of Delay: Timing and Basis for Identifying and Measuring Delay 2024 Sanders, Mark C.
Best Practices in Implementing Emerging Technologies in Construction Controls 2024 Milner, Ben
Does Historical Data on Unique Government Nuclear Facilities Have an Expiration Date? 2024 Fatzinger, Robert G.
FY2022 Department of Energy Project Management Escalation Study for Capital Assets 2024 West, Matthew Zachary