The Risk of Mitigation - A Case Study of the Impact of Contemporaneously Changing Logic

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AACE International (67. : 2023 : Chicago, Ill.) 67th AACE International Conference & Expo 2023 ; Volume 1 of 2
1. Verfasser: Sadauskas, Brenton J. (VerfasserIn)
Pages:67
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2024
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Pitfalls to Avoid When Quantifying Extended Field Office Overhead Costs 2024 Rai, Suleiman Al
Validating Change Order Requests for Forensic Analysis 2024 Carlson, David
Assigning As-Planned Gains-Delays in MIP 3.4, Split Contemporaneous Period Analysis 2024 Carson, Christopher W.
Legal Pitfalls of the "Windows" Delay Analysis Method 2024 Sayed, Ahmed Y. El
Field Overhead – Direct Or Indirect Cost and the Proper Use of NAVFAC Form 4330/43 2024 Florez, Nickolas
Lean Operating Systems – Project and Portfolio Management Data Visualization Using Integrated Reporting 2024 Blodgett, John W.
Insights on Project Performance from 500,000 Projects 2024 Amratia, Dev
Confronting Price Escalation and Volatility Issues with Construction Materials 2024 Opfer, Neil D.
Assessing Contractor Responsible Concurrency When Using MIP 3.3 – Can a Sensible Procedure Be Developed? 2024 Rider, Ronald J.
BIM and VE Optimization for Construction Schedule and Cost Control 2024 Amoah, Kwame B. O.
A Primer for Claims and Disputes 2024 Ciccarelli, John J.
Forensic Delay Analysis of Disrupted Projects: An Alternative Approach Using System Dynamics 2024 Voigt, Alexander
Assessing the Reasonableness and Reliability of CPM Schedules for Use in Forensic Schedule Analyses 2024 Celeste, Brian
The Engineer/Initial Decision Maker’s Role in Adjudicating Claims Under FIDIC 2017 and AIA232-2019 Contracts 2024 Fayed, Rania
Contingency Drawdown and the Roadmap to the Project Cost at Completion 2024 Al-Hiyari, Ghaith
Why Large Capital Projects Are Too Often Over Budget and What to Do About It? 2024 Palmer, Glen R.
Major Project Execution Cost Forecasting– Back to Basics 2024 Nkuah, Moses Y.
The Evolution to Well-Rounded Project Controls Professionals in Aviation 2024 Rutledge, Dana N.
Artificial Intelligence & Machine Learning Impact on Robust Project Control Improvement in Portfolio Management 2024 Baharom, Muhammad Azri Ahmad
Optimization of Procurement in the Construction Industry: What Today’s Environment Has Taught Us 2024 Raynes, Robert
Alle Artikel auflisten