Pitfalls to Avoid When Quantifying Extended Field Office Overhead Costs

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AACE International (67. : 2023 : Chicago, Ill.) 67th AACE International Conference & Expo 2023 ; Volume 1 of 2
1. Verfasser: Rai, Suleiman Al (VerfasserIn)
Pages:67
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2024
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Pitfalls to Avoid When Quantifying Extended Field Office Overhead Costs 2024 Rai, Suleiman Al
Validating Change Order Requests for Forensic Analysis 2024 Carlson, David
Assigning As-Planned Gains-Delays in MIP 3.4, Split Contemporaneous Period Analysis 2024 Carson, Christopher W.
Legal Pitfalls of the "Windows" Delay Analysis Method 2024 Sayed, Ahmed Y. El
Field Overhead – Direct Or Indirect Cost and the Proper Use of NAVFAC Form 4330/43 2024 Florez, Nickolas
Lean Operating Systems – Project and Portfolio Management Data Visualization Using Integrated Reporting 2024 Blodgett, John W.
Insights on Project Performance from 500,000 Projects 2024 Amratia, Dev
Confronting Price Escalation and Volatility Issues with Construction Materials 2024 Opfer, Neil D.
5D Planning in Earthworks Mining Constructions in Hilly Topography 2024 Cuadra, Axel Franco Castro
Key Benefits of 4D BIM Scheduling Implementation in Oil & Gas Projects and the Challenges 2024 Baharom, Muhammad Azri Ahmad
Advanced Measured Mile Method Using GMM 2024 Ghandour, Wael El
Benefits for Dispute Boards with the Application of AACE International Recommended Practices 2024 Rosa, Luis Otavio
Schedule Updates Using Remaining Original Duration Versus Remaining Work Duration 2024 Long, Thomas C.
Maximizing Early Claims Resolution Success Through Contemporaneous Project Data Capture 2024 Glavitsch, Kristin
Death by a Thousand Cuts: Cumulative Impact Claims 2024 Lenz, Colleen
Construction Claim Workbook for Forensic Analysis 2024 Ghandour, Wael El
Schedule Delay Analysis in a Multi-Prime Environment 2024 Wallwork, Joseph W.
Controlling Small Projects 2024 Pulagam, Sudhakar R.
Integrated Real-Time Location System Information and 3D Point Clouds for Object Localization Onsite Using Deep Neural Networks 2024 Bardareh, Hassan
Data-Driven Schedule Risk Forecasting for Construction Mega-Projects 2024 Hovhannisyan, Vahan
Alle Artikel auflisten