IBC 23-50: Urban Infrastructure Improvement Focused on the Community

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International Bridge Conference (2023 : National Harbor, Md.) International Bridge Conference (IBC 2023)
1. Verfasser: Adams, Matthew (VerfasserIn)
Pages:2023
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2023
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
IBC 23-07: Hidden Lake Bridge Restoration 2023 Lohan, Andy
IBC 23-12: Computational Design of Complex Structures with Faster Finite Element Analysis Programs 2023 Svatora, Jeff
IBC 23-17: Detection of Post-Tension Grout Defects in Bridges 2023 Pailes, Brian
IBC 23-22: Accelerated Construction of Unbraced Network Arch Bridge Using SPMTs 2023 Laviolette, Mike
IBC 23-29: Bridging the Digital Divide 2023 Brenner, Joe
IBC 23-33: Strand Jacking of the I-64 Westbound Steel Girder Bridge over the Kanawha River 2023 Quinn, Peter
IBC 23-38: Final Design and Uplift Mitigation for a 300′ radius Steel Curved Girder Bridge 2023 Baxter, Daniel
IBC 23-45: Design and Construction of Fatigue-Prone Detail Retrofits and Corrosion Repairs for Interstate 79 Neville Island Bridge 2023 Deflitch, Jason
IBC 23-50: Urban Infrastructure Improvement Focused on the Community 2023 Adams, Matthew
IBC 23-51: Rebuilding an Urban Viaduct at the Speed of Segmental 2023 Johnson, Eric
IBC 23-53: SR 0095 over Tacony and Bridge Street: Curved Girder viaduct with Integral Posttensioned Concrete Cross-Girder 2023 Kerstetter, Tyler
IBC 23-58: Design and Construction Challenges of the Main Span and East Approach Replacement/Retrofit of TRRA Merchants Bridge over Mississippi River 2023 Staroski, Nick
IBC 23-62: Accelerated Design for Accelerated Construction: Emergency Superstructure Replacement in Tallahassee, Florida 2023 Schneider, Hank
IBC 23-67: A Case Study on Curved Fully Integral Abutment Bridge Thermal Deformation: I-390 over I-490 2023 Bao, Amanda
IBC 23-82: Infrastructure for People and Planet – Bridging the LA River | Taylor Yard Bikeway and Pedestrian Bridge Design and Construction 2023 Sudario, Jennifer
IBC 23-01: Cast Steel Nodes for Bridge Structures Designed and Built with HSS 2023 Pazdon, Jennifer Anna
IBC 23-04: Seismic Isolation for Achieving Functionality of Critical Bridge Structures 2023 Mokha, Anoop
IBC 23-08: Innovative Project Delivery Methods and Technical Solutions on the Emergency Repairs of the Roosevelt Bridge 2023 Sommer, Eric
IBC 23-14: Perquimans River S Bridge Replacement 2023 Noles, Timothy
IBC 23-15: Seismic Strengthening of Bridge Columns with FRP In Lieu Of Steel Jacketing 2023 Ellis, Clyde
Alle Artikel auflisten