IBC 23-16: Nondestructive Evaluation of Post Tensioned Ducts of the Eltham Bridge

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International Bridge Conference (2023 : National Harbor, Md.) International Bridge Conference (IBC 2023)
1. Verfasser: Boone, Shane (VerfasserIn)
Weitere Verfasser: Adams, Annette (VerfasserIn), Cohen, Jeffrey (VerfasserIn)
Pages:2023
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2023
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
IBC 23-06: Rehabilitation of a 1930’s Steel Crescent Truss Arch 2023 Cervo, Nicholas
IBC 23-09: Comprehensive Restoration of a Century Old Suspension Bridge (Wurts Street Bridge over the Rondout Creek 2023 Casey, Sean
IBC 23-13: A State-of-the-Art Analysis and Design of a Continuous Seven Spans Post-Tensioned Bridge with Innovative Seismic Isolation Bearings 2023 Salib, Sameh
IBC 23-18: Structural Design Challenges for an Architecturally Constrained Bridge 2023 Jenkins, Ryan
IBC 23-20: Delivering Value and Resiliency in Bridge and Foundation River Construction 2023 Ricks, Gregory
IBC 23-23: ABC Widening of I-376 Westbound Bridge using Precast Elements 2023 Deflitch, Jason
IBC 23-30: 3D Modeling: Complex Bridge Construction and Emergency Repairs 2023 Stonestreet, Zacharie
IBC 23-32: Unique Girder Erection Techniques for Difficult Site Conditions in Kicking Horse Canyon 2023 Witte, Brian
IBC 23-41: Design and Construction of the New Harry W. Nice / Thomas “Mac” Middleton Bridge 2023 Rueda, Stephen Mattyedwin Salcedo
IBC 23-40: The Good, The Bad, & The Ugly: Long, Phased & Highly Skewed Steel Bridge 2023 Dues, Eric
IBC 23-43: Design and Construction of the Ravensdale Road Bridge 2023 Cochran, Matthew
IBC 23-52: Balanced Cantilever Construction in Alberta 2023 Lewis, Myles
IBC 23-60: Utilizing Innovative Construction Access Design to Minimize Rail Traffic Disruptions 2023 Holub, Austin
IBC 23-68: Experimental Investigation of Noncontact Hooked Bar Lap Splices of Large Reinforcing Bars for Accelerated Bridge Construction 2023 Coleman, Zachary
IBC 23-77: Gantry Erection Procedure of the Mile Long Bridge 2023 Haas, Michael
IBC 23-79: New Champlain Bridge Vver the Saint Lawrence Fiver in Montreal. Design of the Temporary Works for the Construction of the Cable-Stayed Bridge 2023 Caldentey, Alejandro Pérez
IBC 23-81: I-84 Twin Bridges Project 2023 Martz, Benjamin
IBC 23-80: Construction of the Wekiva Parkway Section 6 2023 Bennett, Robert
IBC 23-02: Use of ASTM A1035-CS Corrosion Resistant and High Strength Reinforcement in the New Nice Middleton Bridge Project for Sustainable Bridge Construction 2023 Geber, Hans
IBC 23-03: How Geophysics Contributes to Rebuilding the U.S. Infrastructure: A Case Study Involving Seismic Tomography 2023 Mahvelati, Siavash
Alle Artikel auflisten