Air in Water Distribution Systems—Challenging the Status Quo
|
2023 |
Rüsch, Peter |
Large-Diameter Buried Pipe-Valve System: Case Study of IPL Project and Finite Element Analysis
|
2023 |
Daradkeh, Ashraf Mohammed |
Replacing LADWP Aging Infrastructure—Construction of the River Supply Conduit Upper Reaches Project
|
2023 |
Jimenez, Jorge |
Golf Courses Meet Large Diameter Interceptors
|
2023 |
Pool, Steve |
The Origin of AWWA C207 Ring Flange Design
|
2023 |
Tovey, Terri A. |
Siting a Regional Pump Station—Harder Than It Looks
|
2023 |
Chang, Jun |
Precast Concrete Tunnel Lining Bolt and Shear Pockets Hydraulic Review
|
2023 |
Kan, Derek |
Safety Factors in AWWA Water Pipe Design: A Measurement against Risk?
|
2023 |
Dechant, Dennis A. |
Impact of Water Network Uncertainties on Seismic Rehabilitation Decision-Making for Water Pipelines
|
2023 |
Roy, Abhijit |
A Case History of Design and Construction of a Seismic-Resilient Outfall Pipe within Liquefiable Ground: Design Challenges
|
2023 |
Newby, John |
Test of Long Collar with Superior Ability to Absorb Ground Displacement and Pipeline Design Method of Long Collar to Cross Faults
|
2023 |
Kagawa, Takaaki |
Examining Pipe Cost Changes after Various Disasters in Los Angeles, California
|
2023 |
Kim, Sooin |
Advantages of Underground Logistics Systems Using Pipelines in Airport Applications
|
2023 |
Kaur, Kawalpreet |
A Decision Tree Approach to Illustrate Trenchless versus Open-Cut Construction Methods for the Southern Nevada Water Authority’s Horizon Lateral Program
|
2023 |
Rosales, Juan R. |
Bridge-Supported Aerial Pipeline Installations—A Primer
|
2023 |
Bushdiecker, Keith |
Texas-Style Redesign of a 20-Year-Old, 104 MGD Flow Control Facility
|
2023 |
Blackwelder, Elizabeth R. |
Bridging the Gaps for Pipes and Pedestrians in Lawton, Oklahoma
|
2023 |
Pipher, Tanner |
Customer Service-Oriented Water Distribution Network Management through Optimized Control Valve Installation
|
2023 |
Kim, Kibum |
14 Mile Transmission Main Loop Project Purpose, Challenges, and Successful Completion
|
2023 |
McReynolds, Michael |
Improving LADWP Groundwater Infrastructure—The North Hollywood Central Remediation Well Collector Line (NHC RWCL) Project
|
2023 |
Jansen, Max D. |