Digital Solutions for Asset Management: Creating the Digital Twin — Lessons Learned from Legacy Agencies and New Build Projects

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AREMA Annual Conference (2021 : Online) AREMA 2021 Virtual Conference ; Volume 2
1. Verfasser: Roberts, C. (VerfasserIn)
Weitere Verfasser: Letard, P. (VerfasserIn), Roberts, N. (VerfasserIn)
Pages:2021
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2021
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Crossing-i: An Automated Drone-enabled Rail Grade Crossing Inspection System 2021 Brooks, C.
CBTC & Systems Engineering and Systems Integration in Complex Signalling Projects (PowerPoint Only) 2021 Tomlin, P.
Inspection of Eight-Year-In- Track ACZA Treated Hardwood Ties 2021 Barnes, H. M.
Digital Solutions for Asset Management: Creating the Digital Twin — Lessons Learned from Legacy Agencies and New Build Projects 2021 Roberts, C.
Seismic Retrofit of Merchants Bridge 2021 Eisenbeis, K. R.
Evaluation of Railroad Infrastructure Implementing Nondestructive Methods 2021 Vikers, L.
Modern Survey Techniques for Clearance Improvement 2021 Hamadani, N.
Outgoing AREMA President’s Final Address 2021 Babin, V. R.
Toward a Comprehensive Framework for the Electrical Modeling of Railway Track Circuits 2021 Payne, A.
UAV-based Trespasser Detection for Railway Applications 2021 Vega, E. F.
Using Autonomously Collected Track Deflection Data to Characterize Track Stiffness Transitions 2021 Palese, J. W.
Metro Transit''s Blue Line Tunnel Intrusion Detection Solution: A State of Good Repair Initiative to Provide Solutions for Improving Advanced Warning Time to Train Operators in the Event of a Trespasser Entering the Tunnel 2021 Robberts, J.
Benchmarking Railroad Safety Performance — A Study of Six Countries (PowerPoint Only) 2021 Gerstein, T.
CSX 59th Street Terminal Bridge Program: Extending the Service Life of an Elevated Terminal 2021 Santeford, M. D.
Economics of Shoulder Ballast Cleaning 2021 Chrismer, S.
BNSF Rail Fastener Replacement Program Chicago, IL “UAV innovation for High Accuracy and Repeatability” 2021 Herman, T.
Constant Warning Time Devices and the Benefits of PTC- based Activation Systems 2021 Eby, C. C.
Incoming AREMA President’s Speech 2021 Freeman, M. P.
Railway Industry Update 2021 Hatch, A. B.
Leveraging Connected Highway Vehicle Platooning Technology to Improve the Efficiency and Effectiveness of Train Fleeting under Moving Blocks 2021 Dick, C. T.
Alle Artikel auflisten