Jaguar Raisebore design using LiDAR for back analysis

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AusIMM's Underground Operators Conference (14. : 2021 : Perth, Western Australia; Online) Underground Operators Conference 2021
1. Verfasser: Varden, R. P. (VerfasserIn)
Pages:2021
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2021
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Collaborative development of mine ready electric vehicle 2021 Hodder, J.
Implementation of a High Energy Dissipation Ground Support Scheme Ay 2021 Arcaro, C.
Carrapateena Vent Rise Performance — Geotechnical Design and Calibration 2021 Ormerod, T.
Analysing reduced conveying capability of the orepass systems in Malmberget mine 2021 Skawina, B.
Increased drilling accuracy leads to significant improvement in ore recovery and dilution 2021 Stimpson, R.
Use of drone and LiDAR technology for mapping underground voids 2021 Woolmer, D.
On the flipside: why cost cutting is out; revenue maximization is in and value is always king 2021 Allday, H.
Open stope design; beyond the Stability Graph 2021 McFadyen, B.
An analysis of productivity in sublevel caving mines 2021 Power, G. R.
Case study — blind shaft sinking for BHP Jansen project 2021 Rennkamp, P.
Quantifying the quality of cable bolt installation by acoustic testing 2021 Hassell, R.
Has there been progress on nano Diesel Particulate Matter in the Australian underground hard rock industry? 2021 Davis, C. W.
Development of the production optimiser through collaboration between Evolution Mining and Minnovare 2021 Landers, R.
Secondary means of egress via emergency gig 2021 Green, S.
A Paradigm Shift in Underground Raisebore Reamer Removal 2021 Holland, A.
Olympic Dam open stope observations, tactics and characterisation 2021 Jones, E.
Carrapateena Crows Foot Level Layout — Safety in design to support sub level cave production efficiency and automation 2021 Mooney, A.
Dilution rating system (DRS) 2021 Seymour, C. R. W.
Challenging the Norms Time Usage Model — Mobile Underground Mining Equipment 2021 Ballantyne, R.
Increased productivity using theory of constraints at the Argyle Diamond Mine 2021 Murphy, B.
Alle Artikel auflisten