Implementation of a High Energy Dissipation Ground Support Scheme Ay

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AusIMM's Underground Operators Conference (14. : 2021 : Perth, Western Australia; Online) Underground Operators Conference 2021
1. Verfasser: Arcaro, C. (VerfasserIn)
Weitere Verfasser: Villaescusa, E. (VerfasserIn), Hassell, R. (VerfasserIn), Talebi, R. (VerfasserIn), Kusui, A. (VerfasserIn)
Pages:2021
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2021
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Precharging in previously preconditioned ground 2021 Hawkins, E.
Unlocking value in drill and blast at Olympic Dam — Lime 390 case study 2021 Li, K.
Jaguar Raisebore design using LiDAR for back analysis 2021 Varden, R. P.
Development and permitting of an underground mine at Cowal Gold Operations 2021 Northfield, J.
Maximising asset value through optimal block by block decisions on marginal material 2021 Deucker, E.
The Nova Operation: mining, technology and a look into the EV future 2021 Carr, C.
The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave 2021 Grosser, H.
Quantifying the quality of cable bolt installation by acoustic testing 2021 Hassell, R.
Has there been progress on nano Diesel Particulate Matter in the Australian underground hard rock industry? 2021 Davis, C. W.
Development of the production optimiser through collaboration between Evolution Mining and Minnovare 2021 Landers, R.
Secondary means of egress via emergency gig 2021 Green, S.
A Paradigm Shift in Underground Raisebore Reamer Removal 2021 Holland, A.
Olympic Dam open stope observations, tactics and characterisation 2021 Jones, E.
Carrapateena Crows Foot Level Layout — Safety in design to support sub level cave production efficiency and automation 2021 Mooney, A.
Dilution rating system (DRS) 2021 Seymour, C. R. W.
Challenging the Norms Time Usage Model — Mobile Underground Mining Equipment 2021 Ballantyne, R.
Increased productivity using theory of constraints at the Argyle Diamond Mine 2021 Murphy, B.
Collaborative development of mine ready electric vehicle 2021 Hodder, J.
Implementation of a High Energy Dissipation Ground Support Scheme Ay 2021 Arcaro, C.
Carrapateena Vent Rise Performance — Geotechnical Design and Calibration 2021 Ormerod, T.
Alle Artikel auflisten