(CSC-3710) EXPLORING THE EFFECTIVENESS OF AN INDEPENDENT-INTEGRA TED PROJECT CONTROLS GROUP - A CASE STUDY

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AACE International (65. : 2021 : Online) 65th AACE International Conference & Expo 2021 ; Volume 1 of 2
1. Verfasser: Swarup, Lipika (VerfasserIn)
Weitere Verfasser: Hameen, Erica Cochran (VerfasserIn)
Pages:65
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2021
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
(ADV-3726) ACCELERATING DISASTER RECOVERY WITH AN INTEGRATED SMART CITY MODEL 2021 Battal, Yusa
(BIM-3675) USING 4D MODELING TO PERFORM CRITICAL PATH ANALYSIS FOR DELAYS 2021 Carson, Christopher W.
(BIM-3678) BIM+ INTEGRATED SITE DATA ACQUISITION MODEL FOR CONSTRUCTION PROJECTS 2021 Montaser, Ali
(CDR-3613) WEATHER IMPACTS AND LOSS OF PRODUCTIVITY CLAlMS 2021 Zhao, Tong
(CDR-3650) ALLOCATION METHODS FOR DIRECT COSTS ON LARGE PROJECTS 2021 Schwartzkopf, William C.
(CDR-3732) "CONCURRENT EVENTS" AND OTHER SCHEDULING ISSUES IN THE NEWS 2021 Brasco, Christopher J.
(CSC-3609) CAUSES AND IMPACTS OF DELAY IN CONSTRUCTION PROJECT IN SAUDI ARABIA 2021 Elkhidir, Mossab Abbas
(CSC-3683) COST CONTROL MODEL FOR A MEDICAL FACILITY IN CHINA 2021 Zhang, Lan
(CSC-3768) PRACTICAL APPROACH ON RESOURCE AND COST LOADING A PROJECT SCHEDULE 2021 Napuri, Gino
(CSC-3710) EXPLORING THE EFFECTIVENESS OF AN INDEPENDENT-INTEGRA TED PROJECT CONTROLS GROUP - A CASE STUDY 2021 Swarup, Lipika
(DEV-3687) EXPECTED COMPETENCIES OF GRADUATE QUANTITY SURVEYORS WORKING IN NEW ZEALAND 2021 Cheng, Kam Yuen
(EST-3700) DISCRETE EVENT SIMULATION AS A TOOL FOR COST ESTIMATING 2021 Cook, Thomas C.
(EVM-3614) EARNED VALUE MANAGEMENT SYSTEMS FOR OPERATIONS ACTIVITIES 2021 Melamed, Dan
(EST-3713) ESCALATION STUDY FOR DOE NNSA’S CAPITAL ACQUISITION PROJECTS 2021 Loelius, Charles R.
(PM-3644) PROJECT MANAGEMENT OF REFINERY TA WITH REAL-TIME INDICATOR 2021 Jadhav, Mahesh
(BIM-3653) APPLICATION OF BIM IN EARNED VALUE MANAGEMENT FOR LARGE- SCALE COMPLEX CONSTRUCTION PROJECTS 2021 Liu, Xuejiao
(BIM-3682) CONTROL+ INTEGRA TED DATA ANALYSIS AND REPORTING FOR CONSTRUCTION PROJECTS 2021 Montaser, Ali
(BIM-3692) BIM AND COST ESTIMATION: WHAT WILL CHANGE AND WHAT WILL REMAIN THE SAME 2021 Valderrama, Fernando
(CDR-3684) COST ASSESSMENT MODEL FOR SCHEDULE RECOVERY DUE TO COVID-19 EVENT IN CHINA 2021 Zhang, Lan
(CDR-3711) THERE IS NO SUCH THING AS A FREE NON-WORK DAY 2021 Milburn, Cory R.
Alle Artikel auflisten