(CDR-3719) CONCURRENCY'S ROLE IN ASSESSING CONSTRUCTION DELAY CLAIMS
|
2021 |
Sadauskas, Brenton |
(EST-3656) HOW TO ESTIMATE CONSTRUCTION COSTS OF A NUCLEAR POWER PLANT
|
2021 |
Angelini, Arnaldo M. |
(EST-3601) ENGINEERING MANHOURS ESTIMATION FOR A PROCESS PLANT
|
2021 |
Shaikh, Atiq Akbar |
(EST-3633) ESTIMATING FOR COST CONTROL - NAVIGATING THE SEA OF CHANGE
|
2021 |
Fraizinger, Shoshanna |
(OWN-3592) CAPITAL BUDGETING CRITERIA AND PROJECT SELECTION BY NET PRESENT VALUE (NPV) VS. INTERNAL RATE OF RETURN (IRB)
|
2021 |
Itagi, Chad |
(OWN-3660) HOW THE OWNER CONTRACTING STRATEGY AFFECTS PROJECT CONTROL
|
2021 |
Cabano, Stephen L. |
(OWN-3727) EXECUTABILITY MODELING TO SUPPORT IMPROVED FEDERAL BUDGETING
|
2021 |
Livchack, David |
(CDR-3621) CHALLENGES IN SELECTING AND DEFENDING AN APPROPRIATE METHOD IMPLEMENTATION PROTOCOL (MIP) IN AACE RP 29R-03 THROUGH TWO CASE STUDY PROJECTS
|
2021 |
Khademagha, Saeid |
(CDR-3622) TIMING YOUR TIME EXTENSIONS AND GENERAL CONDITIONS COSTS
|
2021 |
Furniss, Brian J. |
(CDR-3697) A DECISION TREE APPROACH FOR THE ANALYSIS OF CONSTRUCTION DELAY CLAIMS
|
2021 |
Prinsloo, Hendrik |
(CDR-3743) THE TOP TEN MISTAKES MADE IN FORENSIC ANALYSIS
|
2021 |
Palmer, Glen R. |
(CSC-3620) HIGH-CONFIDENCE METHODS FOR ASSESSING COMPLEX PROJECT TIME AND COST
|
2021 |
Saifi, Abbas |
(CSC-3734) A CASE STUDY IN THE RAPID DEPLOYMENT OF NEW FORECASTING ALGORITHMS ON A LARGE TOLLWAY CONSTRUCTION PROGRAM
|
2021 |
Keels, D. Andy |
(EST-3698) CONSTRUCTION CRANES PARAMETRIC COST ESTIMATING
|
2021 |
Silva, Glauco Bezerra da |
(EST-3731) BENCHMARKING TOOL FOR PLANNING AND ASSESSING CONSTRUCTION ESTIMATES
|
2021 |
Matheson, Zachary |
(EVM-3664) EVOLVING TECHNOLOGICAL TRENDS FOR AUTOMATED CONSTRUCTION PROGRESS MONITORING
|
2021 |
Barbarosoglu, Bahadir V. |
(OWN-3666) IMPROVING PROJECT GATEKEEPING THROUGH STAKEHOLDER ALIGNMENT AND BEHAVIORAL DECISION MAKING
|
2021 |
Wolfson, David C. |
(ADV-3726) ACCELERATING DISASTER RECOVERY WITH AN INTEGRATED SMART CITY MODEL
|
2021 |
Battal, Yusa |
(BIM-3675) USING 4D MODELING TO PERFORM CRITICAL PATH ANALYSIS FOR DELAYS
|
2021 |
Carson, Christopher W. |
(BIM-3678) BIM+ INTEGRATED SITE DATA ACQUISITION MODEL FOR CONSTRUCTION PROJECTS
|
2021 |
Montaser, Ali |