2B-2 Voluntary Early Removal of Sediments Completed at Former Green Bay MGP

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:WEDA Dredging Summit and Expo (2021 : Online) Dredging Summit and Expo 2021
1. Verfasser: Goetz, Staci (VerfasserIn)
Weitere Verfasser: Paulson, Robert (VerfasserIn), Hagen, Jennifer (VerfasserIn), Simmons, Christine (VerfasserIn), Hritsuk, Eric (VerfasserIn)
Pages:2021
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2021
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
1A-3 Utilization of Passive and Active Mechanical Dewatering Technologies to Process Navigational Dredged Material on a Small Footprint 2021 Douglas, Scott
1B-1 How Much Is Too Much? Sampling Density in Stratified Sediment Bedforms for Estimating Surface-Area Weighed Average Concentrations 2021 Thomas, Evan
2B-1 River Remediation Case Study: Capturing PCBS from Impacted Slurry Via Separation and Water Treatment 2021 Ponstein, Scott
2A-4 Overcoming Barriers to Beneficial Use of Dredged Material in the US 2021 Bell, Kristin
Engineering and Best Management Considerations for Thin Layer Placement Projects 2021 Mohan, Ram
3A-2 ODESS: An Interactive Decision-Making Tool for Endangered Species Data Collection, Reporting, and Risk Assessment 2021 Sessions, Michael
3A-3 Harvesting of Bedload Material and Potential Applications for Coastal Restoration 2021 Tucker, Randall
1A-1 Nautical Depth Determination Through Definition of Fluid Mud Characteristics 2021 Marijnissen, Kari-Ann
1B-2 Sand Particle Size Analysis by SedImaging in a Field Lab 2021 Horstmeier, Greg
2A-2 Beneficial Use: Estuarine Island Creation with Intracoastal Waterway Maintenance Dredged Material in Lake Worth Lagoon; Palm Beach County, Florida 2021 Siddiqui, Yehya
2A-1 Revisiting historic dredged material habitat improvement sites informs the future of beneficial use initiatives 2021 Berkowitz, Jacob
Ecological/Environmental Considerations and Select Case Studies 2021 Innocenti, Rachel
4B-1Rock Placement and Stability for Offshore Windmill Foundation 2021 Miedema, Sape
5B-1 Finding the Silver Lining in COVID-19 Impacts on National Dredging Quality Management Program (DQM) QA Practices 2021 Allen, Brenda
1A-2 Salt Mining Dredge – Electric 1100 hp Ladder Pump with 94” Dual Wheel Excavator 2021 McTaggart, Duncan
1B-3 Vibracore Sediment Acquisition Monitoring (V-SAM) for Remediation Dredging Design at the Portland Harbor Superfund Site 2021 Fuglevand, Paul
2A-3 Restoration of Historical Subaqueous Borrow Pits for Management of Navigational Dredged Material in Coastal New Jersey 2021 Douglas, Scott
2B-3 Innovative Treatment of Wood-Waste Impacted Sediments Using Reactive Amendments and Diffusive-Gradient-in-Thin-Films Passive Porewater Sulfide Testing Techniques 2021 Berlin, Dan
Thin Layer Placement Projects – A Contractor’s Perspective 2021 Timmis, Andrew
3A-3 The Skinny on Fill Placement – Choosing Seven Fill Areas from Seventy and 45 million CY of Borrow Amongst 200 million 2021 Hartman, Benjamin
Alle Artikel auflisten