Physics beyond 10 34
|
2000 |
Sanda, I. |
CESR Performance and Upgrade Status
|
2000 |
Henderson, S. |
PEP-II LER Nonlinear Vacuum Pressure Increase with Current
|
2000 |
Heifets, S. |
Experimental Investigations of the Eectron Cloud Key Parameters
|
2000 |
Collins, I. |
Beam Instrumentation for Commissioning PEP-II with BaBar
|
2000 |
Fisher, A. |
Synchrotron Radiation Monitor for KEK B-Factory
|
2000 |
Mitsuhashi, T. |
Experience with Multibunch Beam Stability at PEP-II
|
2000 |
Minty, M. |
A mini-TPC for SLAC PEP-II Commissioning
|
2000 |
Lepeltier, V. |
Correction of Optical Functions in the KEKB Rings
|
2000 |
Koiso, H. |
Beam-Based Solenoid Compensation for the PEP-II
|
2000 |
Cai, Y. |
Beam-Beam Performance and Luminosity Optimization at KEKB
|
2000 |
Funakoshi, Y. |
DAG[Phi]NE Performance with the Experimental Detector
|
2000 |
Zobov, M. |
Commissioning of the KEKB B-Factory
|
2000 |
Oide, K. |
The KEKB Bunch Oscillation Recorder
|
2000 |
Kikutani, E. |
Beam Diagnostics and Correction at CESR
|
2000 |
Henderson, S. |
Beam Position Monitor System for KEKB
|
2000 |
Tejima, M. |
Effect of Linearized Beam-Beam Interaction on Radiation Emittance
|
2000 |
Perevedentsev, E. |
Simulation of the Beam-Beam Effect in KEKB
|
2000 |
Ohmi, K. |
Beam Lifetime and Beam Tails in LEP
|
2000 |
Burkhardt, H. |
Beam-Beam Experience at the PEP-II B-Factory
|
2000 |
Kozanecki, W. |