ICONE29-91929 Applicability Study on Human Reliability Analysis for Severe Accidents in Nuclear Power Plants

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International Conference on Nuclear Engineering (29. : 2022 : Online) Proceedings of 2022 29th International Conference on Nuclear Engineering (ICONE 29) ; Volume 13: Risk assessments and management
1. Verfasser: Zhao, Ming (VerfasserIn)
Weitere Verfasser: Chen, Shuai (VerfasserIn), Xu, Jie (VerfasserIn), Zhou, Jianzhang (VerfasserIn), Qing, Tao (VerfasserIn)
Pages:2022 29
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2022
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
ICONE29-89671 Dependence Analysis of Nuclear Power Plant Operators Based on HRA 2022 Xu, Jie
ICONE29-89375 Relay Chatter Analysis With Practical Application in Seismic PSA in Nuclear Power Station 2022 Yang, Jianfeng
ICONE29-89803 Study on Interfacing System LOCA of VVER-1200 2022 Du, Jinyan
ICONE29-90396 Application of Nuclear Insurance Risk Survey Results in Nuclear Power Plant Safety Improvement Program 2022 Ping, Jiang
ICONE29-90820 Research on Risk-Informed Regulation Approaches of MSPI and SDP 2022 Zhang, Guoxu
ICONE29-90907 Applying the PIRT Approach to the Meteorological Hazards Wind and Rainfall in Relation to Industrial Needs: Benefits and Lessons Learned 2022 Morvan, Tiphaine Le
ICONE29-91381 Fire Probability Safety Analysis for a Compact Small Modular Reactor 2022 Chen, Yanzhu
ICONE29-91782 Probability Safety Analysis for Nuclear Power Plant Long-Term Temporary Shutdown State 2022 Chen, Yanzhu
ICONE29-91785 The Development and Application of Real-Time Risk Monitor System Based on Level 2 PSA for NPP 2022 Li, Wenjing
ICONE29-91837 Construction and Application of Mitigation System Performance Index (MSPI) Platform for a China Nuclear Power Plant 2022 Zhang, Jie
ICONE29-91949 Spent Fuel Pool Risk Analysis for a CPR1000 Unit 2022 Weidong, Liu
ICONE29-91957 Access Time and Safety Benefit Analysis of Additional Temporary Water Injection Measures on Primary After the Fukushima 2022 Liu, Weidong
ICONE29-92038 Probabilistic Analysis of Containment Overpressure Failure in Level 2 PSA 2022 Liu, Yu
ICONE29-92301 Radioactive Substance Release Risk Assessment for Fuel Mechanical Damage in —uel Route 2022 Wang, Ming
ICONE29-93001 Research on Key Problems of Digital Instrument and Control System Reliability Analysis for Probabilistic Safety Assessment 2022 Lin, Shuhan
ICONE29-92462 PSA Application in UK HPR1000 Numerical Targets Evaluation 2022 Xiao, Lingmei
ICONE29-93128 Research on Development of On-Line Monitoring of Fuel Damage in Nuclear Power Plant 2022 Yiduo, Tian
ICONE29-93109 PSA Application for UK HPR1000 ALARP Demonstration 2022 Wang, Zhiwen
ICONE29-93639 The Application of Risk-Informed Management Index in NPPs Risk Management 2022 Shijun, Chen
ICONE29-89268 Nuclear Power Plant Design Optimization Based on Risk-Informed Method 2022 Li, Wenjing
Alle Artikel auflisten