ICONE29-90137 Application of Qualitative and Quantitative Configuration Risk Assessment in AP1000 Unit Outage Scheduling Optimization

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International Conference on Nuclear Engineering (29. : 2022 : Online) Proceedings of 2022 29th International Conference on Nuclear Engineering (ICONE 29) ; Volume 13: Risk assessments and management
1. Verfasser: Wang, Zhenqi (VerfasserIn)
Weitere Verfasser: Huang, Weibing (VerfasserIn), Zhou, Jian (VerfasserIn), Lin, Huan (VerfasserIn), Tao, Yinyong (VerfasserIn), Zhang, Jun (VerfasserIn)
Pages:2022 29
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2022
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
ICONE29-89268 Nuclear Power Plant Design Optimization Based on Risk-Informed Method 2022 Li, Wenjing
ICONE29-90277 Research on Risk Management of Nuclear Engineering - Taking T Project Reverse Power Supply As an Example 2022 Wang, Baoquan
ICONE29-90137 Application of Qualitative and Quantitative Configuration Risk Assessment in AP1000 Unit Outage Scheduling Optimization 2022 Wang, Zhenqi
ICONE29-91480 Application of Risk-Informed Approach in Emergency Compressor Emergency Backup Function Test 2022 Liu, Deyi
ICONE29-92253 Application of Probabilistic Safety Assessment in the Risk Analysis and Management of Interface Systems LOCA in a Nuclear Power Plant 2022 Liu, Leilei
ICONE29-92128 Pilot Application of RISMC Methodology on Specific SBLOCA Sequences of Passive NPP 2022 Du, Yun
ICONE29-92450 Inadvertent Reactor Pit Flooding Risk Research on the Generation Ill Nuclear Power Plant 2022 Xiao, Lingmei
ICONE29-93057 Study on Methodology and Application of Seismic Level 2 Probabilistic Safety Assessment for Nuclear Power Plants 2022 Zheng, Hongjia
ICONE29-93142 Research on Optimization Method of Risk-Informed In-Service Inspection Strategy of RCP-RRA Connection Inlet Valve in Nuclear Power Plant 2022 Li-Hui, Chen
ICONE29-93180 Application of Risk-Informed Technology in Emergency Operating Procedure Development 2022 Liu, Liu
ICONE29-93474 Review of Fire Common Mode Analysis and Probabilistic Safety Assessment of Fire Common Modes for an Operating Nuclear Power Plant 2022 Huang, Lihua
ICONE29-93391 Missile Risk Assessment for Nuclear Power Plant Under Super Typhoon 2022 Feng, Bingchen
ICONE29-93590 Case Study on Significance Determination Process for NPPs Abnormal Events at Power 2022 Chen, Shijun
ICONE29-89671 Dependence Analysis of Nuclear Power Plant Operators Based on HRA 2022 Xu, Jie
ICONE29-89375 Relay Chatter Analysis With Practical Application in Seismic PSA in Nuclear Power Station 2022 Yang, Jianfeng
ICONE29-89803 Study on Interfacing System LOCA of VVER-1200 2022 Du, Jinyan
ICONE29-90396 Application of Nuclear Insurance Risk Survey Results in Nuclear Power Plant Safety Improvement Program 2022 Ping, Jiang
ICONE29-90820 Research on Risk-Informed Regulation Approaches of MSPI and SDP 2022 Zhang, Guoxu
ICONE29-90907 Applying the PIRT Approach to the Meteorological Hazards Wind and Rainfall in Relation to Industrial Needs: Benefits and Lessons Learned 2022 Morvan, Tiphaine Le
ICONE29-91381 Fire Probability Safety Analysis for a Compact Small Modular Reactor 2022 Chen, Yanzhu
Alle Artikel auflisten