LEP Beam instrumentation
|
1991 |
Bovet, C. |
Status of beam instrumentation at the SSC Laboratory
|
1991 |
Webber, R. C. |
Improvement in the profile and emittance measurement system of the KEK-PS external
|
1991 |
Tanaka, K. H. |
A real time bunch length monitor using beam spectrum for the TRISTAN AR
|
1991 |
Jeiri, T. |
Progress on the development of APS beam position monitoring system
|
1991 |
Decker, G. |
Beam position measurements at the SIS
|
1991 |
Peters, A. |
Orbit measurement techniques at Daresbury
|
1991 |
Ring, T. |
High sensitive BPM for linear colliders
|
1991 |
Suhkarov, N. J. Zinevich, D. P. |
Polarization measurements in electron-Dositron colliders
|
1991 |
Baier, V. N. |
Investigation of seismic vibrations and relative displacements of linear collider VLEPP
|
1991 |
Baklakov, B. A. |
Beam diagnostics of the Ring Cyclotron
|
1991 |
Itahashi, T. |
New beam instrumentation in the AGS Booster
|
1991 |
Witkover, R. L. |
Beam diagostic instrumentation of the Synchrotron Radiation Research Center
|
1991 |
Jan, G.-J. |
Experience with a fast wire scanner for beam profile measurements at the CERN PS
|
1991 |
Hancock, S. |
Non-destructive profile monitor in a beam transport line
|
1991 |
Adachi, T. |
Beam profile measurement by counting X-ray emitted from target wire
|
1991 |
Ando, A. |
An autocorrelation technique for measuring sub-picosecond bunch length using coherent transition radiation
|
1991 |
Barry, W. |
Bunch shape measurements at the INR linac
|
1991 |
Feschenko, A. V. |
Beam position monitor with low impedance for B-factories
|
1991 |
Kalinin, A. S. |
Bunched beam Schottky signal measurements for the Tevatron stochastic cooling system
|
1991 |
Jackson, G. |