Trash to Treasure: How Lime Turns Bad Soils into Pipe Backfill

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Pipelines Conference (2021 : Online) Pipelines 2021 ; 3: Construction and rehabilitation
1. Verfasser: Temple, Chase (VerfasserIn)
Weitere Verfasser: Howard, Amster (VerfasserIn)
Pages:2021
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2021
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Collaboration—A Key to Success on a Challenging Pipeline Project 2021 Ellenberger, Christine
Evaluation of CIPP Design Equation for Polymeric Spray Applied Pipe Lining 2021 Kouchesfehani, Zahra Kohankar
An Overview of Cyclic Loading and Fatigue on Steel and PE Pipe during HDD Installations 2021 Campos, Urso A.
Construction Challenges with a Large Diameter Tunnel 2021 Vazquez, Miguel
Inglewood Sanitary Trunk—A Case Study in Using Today’s State of the Art Technologies to Provide Sewage Conveyance Capacity to Meet Tomorrow's Needs 2021 Ilasewich, Patrick
Non-Disruptive, Close-Fit Pressure Pipe Rehabilitation System Selected among Several Options for Critical Tunnel Project 2021 Soldati, Steven J.
Pipe Bursting for Water Line Replacement: A Case Study 2021 Blondell, John A.
Keeping Construction Going during the COVID-19 Pandemic 2021 Davies, Tom
Lining Steel Watermains to Allow Expansion of Rail and LRT Lines in Calgary 2021 Bontus, George J.
Structural Renewal of a 60 in. Potable Water Transmission Main Using CFRP for New Jersey American Water 2021 Conklin, Richard D. Jr.
A Case Study on the City of Calgary Rangeview Sanitary Trunk Pipeline Project 2021 Jones, Brent N.
Essential Infrastructure Emergency Repair of the West Fork Interceptor 2021 Davies, Tom
DC Water Anacostia Force Main Emergency Repair 2021 Ojdrovic, Rasko
Challenging Rehabilitation of a Trunk Sewer Using Sprayed Geopolymer Lining in Ontario 2021 Headland, Paul
A Framework for Structural Design of Geopolymer Spray Applied Pipe Lining 2021 Tehrani, Amin Darabnoush
CIPP Design Reconciliation: How It Works and Why It's Important 2021 Braun, Adam
DC Water at Work: Third Party Project Impact Mitigation of a Critical Trunk Sewer through Multiagency Collaboration 2021 Bian, Steve
Lessons Learned from Rehabilitation of Multiple 150-in. Diameter Siphons 2021 Parks, Randall
A Summary of Cased Highway Crossing Design Trends in Alberta 2021 Greaves, Thomas H.
Harnessing Advanced Inspection Technologies to Assess Metallic Water Transmission Mains 2021 Chimal, Victor Bernal