HOW MACHINE LEARNING IS IMPROVING PRODUCTION ON OFFSHORE PLATFORMS

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Offshore Technology Conference (2020 : Houston, Tex.) Offshore Technology Conference (OTC 2020) ; Volume 2 of 6
1. Verfasser: Herve, P. (VerfasserIn)
Weitere Verfasser: Prado, G. (VerfasserIn), Rosner, M. (VerfasserIn)
Pages:2020
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2020
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
HIGH PRESSURE TESTING OF A PILOT SUBSEA COMPACT FLOTATION UNIT 2020 Zhao, H.
QUALIFICATION OF A SUBSEA SULPHATE REMOVAL SYSTEM 2020 Plasencia, J.
CONDITION MONITORING WITHOUT MACHINE OR FIELD DATA: TRANSFORMING MAINTENANCE SYSTEM INFORMATION TO MEASURE EQUIPMENT DEGRADATION 2020 Pereira, P.
VIGDIS BOOSTER STATION - NEXT GENERATION BOOSTER PROJECT 2020 Helmers, P.
SUBSEA PROCESSING SYSTEMS PREDICTIVE MAINTENANCE ENABLED BY CONDITION MONITORING SYSTEM 2020 Arcangeletti, G.
A NOVEL WAY OF PROJECT MANAGEMENT TO ENSURE ENGAGEMENT FOR SUCCESSFUL DIGITAL TRANSFORMATION 2020 Lamacchia, D.
WHAT THE DESIGN CODES DON'T TELL YOU - HOW TO ENSURE A LEAK-FREE JOINT 2020 John, T.
STATE-OF-THE-ART DEVELOPMENT OF OFFSHORE WATER DEAERATION PROCESSES UTILIZING HIGH-PURITY NITROGEN FOR CHEMICAL FREE OXYGEN REMOVAL 2020 Isdahl, O.
COMPARISON OF SEISMIC RESPONSES OF A FIXED OFFSHORE STRUCTURE FOR GROUND MOTION RECORDS CONSIDERED NEAR FAULT EFFECT AND FLING EFFECT GENERATED USING THREE METHODS 2020 Duman, S.
ENHANCED RIGID JUMPER VIV FATIGUE ASSESSMENT- GUIDANCE NOTES 2020 Nair, A.
SECONDARY CONTROL IN SUBSEA MINING 2020 Teuteberg, M.
REAL-TIME COMPOSITION MEASUREMENT FOR FISCAL, ALLOCATION AND PROCESS OPTIMIZATION 2020 Potten, G.
FLOATING PRODUCTION SYSTEMS: WHATS NEXT? 2020 Turner, W.
SUBSEA STRUCTURE AND PIPELINE DESIGN AUTOMATION USING DIGITAL FIELD TWIN 2020 Bhowmik, S.
QUALIFICATION OF HIGH-CYCLING VALVES AND ELECTRIC ACTUATORS FOR SUBSEA PROCESSING APPLICATIONS 2020 Pagani, C.
VIRTUAL SENSORS FOR MOORING LINE TENSION MONITORING 2020 Jaiswal, V.
ADVANCING BOP REILABILITY THROUGH IOT TECHNOLOGY 2020 Meziou, A.
A NEW AUTOMATED CUTTING VOLUMES MODEL ENHANCES DRILLING EFFICIENCY 2020 Rubaii, M.
BUILDING THE WORLD'S FIRST OFFSHORE ALL-MEMBRANE WATER INJECTION PLANT 2020 Orr, G.
NGL RECOVERY AT THE GULF OF MEXICO: A PROFITABLE STRATEGY AT OFFSHORE FACILITIES 2020 Boffelli, G.
Alle Artikel auflisten