Vertical and inclined raise bore performance at Dugald River mine

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AusIMM Underground Operators' Conference (13. : 2017 : Gold Coast, Queensland) 13th AusIMM Underground Operators' Conference 2017
1. Verfasser: Carswell, J. F. (VerfasserIn)
Weitere Verfasser: Reitsema, G. (VerfasserIn), Lee, M. (VerfasserIn)
Pages:13
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2017
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
Fatigue risk in your operations - real or rubbish? It actually depends 2017 Haskins, B.
Eight days entrapped - PT Nusa Halmahera Mineral’s rescue of a trapped miner 2017 Kosmara, K.
Inflows into longwall mines from inundated overlying workings 2017 Klenowski, G.
Towards an understanding of production costs at Australia’s underground gold mines 2017 Ulrich, S.
A simple and accurate method for Ore Reserve estimation and Mineral Resource depletion in caving mines 2017 Campbell, A. D.
Mt Wright - managing unique risks 2017 Long, S.
Long hole plug - addressing the hazard of bogged rods in ’upholes’ 2017 Thomas, S.
Vertical and inclined raise bore performance at Dugald River mine 2017 Carswell, J. F.
The CSA ventilation upgrade - geotechnical challenges and learnings 2017 Sidea, D.
Revolving doors 2017 Rouse, P.
The mining worker of the future - the impact of technology on people and concepts of work and gender 2017 Abrahamsson, I.
Improving calibration of flow models against SLC marker trials by linking blasting effects to particle mobility 2017 Campbell, A. D.
Innovations in underground hard rock operator efficiency - through simulation-based training technologies and processes 2017 Karadjian, G. K .
Blasting related indices as the key to underground blasting improvements in a challenging rock mass 2017 Jackson, J.
The evolution of production blasts at Ernest Henry Mine 2017 Kloot, C. te
Improving safety through technology - Orica wireless electronic blasting system trials at Ernest Henry Mine 2017 Kloot, C. te
Improving the prediction of stope hanging wall dilution - a critical factor to the success of Dugald River 2017 Hassell, R.
Increasing stope recovery in an underground gold mine by using effective analysis, corrective action and employee engagement processes 2017 Heberle, A.
Attractive workplaces in future underground mining 2017 Johansson, J.
Modern mining - why bandwidth matters 2017 Kent, D.
Alle Artikel auflisten