(PS-3493) IMPROVE PLANNING AND DECISION-MAKING USING ADVANCED SCHEDULE AND REPORTING MANAGEMENT

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AACE International (64. : 2020 : Online) 64th AACE International Conference & Expo 2020 ; Volume 2 of 2
1. Verfasser: Nelson, Amv C. (VerfasserIn)
Weitere Verfasser: Patel, Siddharth (VerfasserIn), Baweja, Satinder S. (VerfasserIn)
Pages:64
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2021
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
(OWN-3478) OWNER VALIDATION OF CONTRACTORS" COST FORECASTS 2021 Mathias, Robert C.
(OWN-3497) MANAGING SCOPE CREEP IN THE PUBLIC SECTOR 2021 Vailaya, Rashmi
(PM-3407) CHALLENGES FOR COST CONTROL IN OPERATIONS IN PERUVIAN SMALL COMPANIES OF CONSTRUCTION 2021 Fernandez, Gloria Luz Flores
(PS-3440) WHEN IS A BASELINE NOT A BASELINE? PROBLEMS AND SOLUTIONS OF USING THE P6 BASELINE FUNCTION 2021 Nasui, Beatrice
(RISK-3540) CONDITIONAL BRANCHING MODELS HOW PROJECT MANAGERS TYPICALLY REACT TO SCHEDULE OVERRUNS 2021 Hulett, David T.
(TCMA-3459) THE UNIT PRICE PROCESS FOR ESTIMATE DATA DEVELOPMENT AND BENCHMARKING 2021 Bredehoeft, Peter R.
(TCMA-3550) SCOPE CHANGE CONTROL — KPI: A PREDICTIVE ANALYTIC’S APPROACH TO EVALUATE THE STATUS OF PROGRESS, TIME, AND COST 2021 Seddiki, Brahim
(PM-3470) HUMAN FACTORS IN PROJECT PLANNING AND MANAGEMENT: SUGGESTIONS FOR IMPROVEMENT 2021 Onotano, Michael O.
(PS-3427) SUCCESSFUL DESIGN SCHEDULING 2021 Carson, Christopher W.
(PS-3493) IMPROVE PLANNING AND DECISION-MAKING USING ADVANCED SCHEDULE AND REPORTING MANAGEMENT 2021 Nelson, Amv C.
(PS-3496) INTERPRETING LOGIC PATHS IN MULTI-CALENDAR PROJECT SCHEDULES 2021 Boyle, Thomas M.
(RISK-3524) RISK ASSESSMENT OF A PIPELINE CONSTRUCTION PROJECT IN ALBERTA DURING EL NINO YEAR 2021 Abdelgawad, Mohamed
(RISK-3569) USING THE NEW-SCOPE RISK MODEL AT SCALE UNDER COMPLEX SCHEDULE CONFIGURATIONS 2021 Gastelum, Jason
(TCM-3503) STRATEGIC PORTFOLIO MANAGEMENT: FUNDING AND FINANCE METHODOLOGIES 2021 Stephenson, H. Lance
(TCMA-3462) ADAPTING DATA MANAGEMENT STRUCTURES TO IMPROVE PERFORMANCE IN POST-DISASTER SCENARIOS 2021 Bomba, Susan
(TCMA-3502) BENCHMARKING FOR COMPETITIVE ADVANTAGE 2021 Stephenson, H. Lance
(PS-3401) CRASHING THE SCHEDULE WITHOUT LOSING TRACK OF REALITY 2021 Maloney, Jarod M.
(PS-3400) MANAGING CONTRACTOR SCHEDULE SUBMITTALS WITH HIGHER EFFICIENCY 2021 Polen, Thomas
(RISK-3479) VARIABILITY IN ACCURACY RANGES: A CASE STUDY IN THE US AND CANADIAN POWER INDUSTRY 2021 Hollmann, John K.
(RISK-3457) THE LEWIS AND CLARK EXPEDITION'S INTEGRATED COST, SCHEDULE, AND RISK ANALYSIS 2021 Fatzinger, Robert G.
Alle Artikel auflisten