(PM-3470) HUMAN FACTORS IN PROJECT PLANNING AND MANAGEMENT: SUGGESTIONS FOR IMPROVEMENT

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AACE International (64. : 2020 : Online) 64th AACE International Conference & Expo 2020 ; Volume 2 of 2
1. Verfasser: Onotano, Michael O. (VerfasserIn)
Pages:64
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2021
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
(PS-3401) CRASHING THE SCHEDULE WITHOUT LOSING TRACK OF REALITY 2021 Maloney, Jarod M.
(PS-3400) MANAGING CONTRACTOR SCHEDULE SUBMITTALS WITH HIGHER EFFICIENCY 2021 Polen, Thomas
(RISK-3479) VARIABILITY IN ACCURACY RANGES: A CASE STUDY IN THE US AND CANADIAN POWER INDUSTRY 2021 Hollmann, John K.
(RISK-3457) THE LEWIS AND CLARK EXPEDITION'S INTEGRATED COST, SCHEDULE, AND RISK ANALYSIS 2021 Fatzinger, Robert G.
(RISK-3492) UTILIZING SCENARIO PLANNING ON THE RISK ASSESSMENT EXERCISE FOR HIGH COMPLEXITY PROJECTS 2021 Shakourifar, Abbas
(TCM-3331) ASSOCIATION OF ENGINEERING DESIGN QUALITY AND PROJECT PERFORMANCE 2021 O'Connor, James T.
(TCM-3430) COST ENGINEERING ROLES & THE PROJECT LIFECYCLE: PROVIDING A FRAMEWORK 2021 Johnson, Nicole
(TCM-3446) INTEGRATED PROJECT CONTROLS 2021 Baweja, Satinder S.
(TCM-3468) INTEGRATING PROCUREMENT WITH PROJECT CONTROLS IS CRITICAL FOR COST MANAGEMENT 2021 Ronak, Christopher W.
(TCMA-3375) ENHANCING DATA RELIABILITY IN A WORLD OF INCREASING INFORMATION 2021 French, Michael A.
(TCMA-3518) THE IMPACT OF BUDGET SETTING PRACTICES ON PROJECT COST EFFICIENCY AND PREDICTABILITY — CASE STUDY: UTILITY RENEWAL PROJECTS IN AUSTRALIA 2021 Lesnie, Michael
(PM-3470) HUMAN FACTORS IN PROJECT PLANNING AND MANAGEMENT: SUGGESTIONS FOR IMPROVEMENT 2021 Onotano, Michael O.
(PS-3427) SUCCESSFUL DESIGN SCHEDULING 2021 Carson, Christopher W.
(PS-3493) IMPROVE PLANNING AND DECISION-MAKING USING ADVANCED SCHEDULE AND REPORTING MANAGEMENT 2021 Nelson, Amv C.
(PS-3496) INTERPRETING LOGIC PATHS IN MULTI-CALENDAR PROJECT SCHEDULES 2021 Boyle, Thomas M.
(RISK-3524) RISK ASSESSMENT OF A PIPELINE CONSTRUCTION PROJECT IN ALBERTA DURING EL NINO YEAR 2021 Abdelgawad, Mohamed
(RISK-3569) USING THE NEW-SCOPE RISK MODEL AT SCALE UNDER COMPLEX SCHEDULE CONFIGURATIONS 2021 Gastelum, Jason
(TCM-3503) STRATEGIC PORTFOLIO MANAGEMENT: FUNDING AND FINANCE METHODOLOGIES 2021 Stephenson, H. Lance
(TCMA-3462) ADAPTING DATA MANAGEMENT STRUCTURES TO IMPROVE PERFORMANCE IN POST-DISASTER SCENARIOS 2021 Bomba, Susan
(TCMA-3502) BENCHMARKING FOR COMPETITIVE ADVANTAGE 2021 Stephenson, H. Lance
Alle Artikel auflisten