Benefits of Using Confidence Intervals in Reports of Project Cost Overrun
|
2020 |
Mejía, Guillermo |
An Empirical Analysis of Sources of Cost and Schedule Growth for Facilities Projects
|
2020 |
Shalwani, Amirali |
Investigating the Human Errors in 4D BIM Construction Scheduling
|
2020 |
Kandregula, Shravan Kumar |
Planning BIM-Based Design Projects: A Product-Process Framework
|
2020 |
Abou-Ibrahim, Hisham |
Toward Automated Virtual Assembly for Prefabricated Construction: Construction Sequencing through Simulated BIM
|
2020 |
O'Neill, Gilmarie |
Exploring the Cost Benefit of Building Information Modeling Implementation in Metal Stud Framing—A Central Valley Specialty Contractor's Perspective
|
2020 |
Wu, Wei |
Utilizing Graphite Powder to Improve Concrete Conductivity, Compressive Strength, and Workability
|
2020 |
Al-Bayati, Ahmed Jalil |
Integrating Embodied Impacts and Costs during Early Design Phase of Buildings: A Case Study
|
2020 |
Zeng, Ruochen |
Implementation of Design for Manufacture and Assembly (DfM A) Principles in Construction: A Case Study
|
2020 |
Tan, Tan |
Effective Strategies for Allocating Construction Inspection Resources in Highway Projects
|
2020 |
Mohamed, Mamdouh |
Conceptual Model among Neighborhood Environment, Personal Competence, and Quality of Life of Older Adults Aging in Place: Based on “The Ecological Theory of Aging
|
2020 |
Zhang, Fan |
Proposed Improvements to the Construction of Electrically Conductive Concrete Pavement System Based on Lessons Learned
|
2020 |
Sadati, S. M. Sajed |
Optimal Selection of Integrated Project Procurement Strategies
|
2020 |
Osman, Hesham |
Understanding the Sub-Contractual Relationship for Proper Management of Construction Projects
|
2020 |
Assaad, Rayan |
How to Choose a Trusted Contractor? Ability, Experience, and Reputation
|
2020 |
Yin, Hang |
Analysis on the Obstacles of Implementing Small and Medium Public-Private Partnership for U.S. Infrastructure
|
2020 |
Liang, Yunping |
Investigating Vertical Integration Strategies in Modular Construction
|
2020 |
Eldamnhoury, Ebrahim S. |
Treatment of Concurrent Delays and the Prevention Principle in Construction Delay Claims
|
2020 |
Abdul-Malak, Mohamed-Asem |
Classification of Contract-Related Documentation for Evidentiary Purposes in Construction Claims and Disputes Resolutions
|
2020 |
Abdul-Malak, Mohamed-Asem |
PPPs for Healthcare Facilities in British Columbia: A Preliminary Analysis
|
2020 |
Aziz, Ahmed Abdel |