CESR Upgrade and Conversion to a B Factory
|
1993 |
Welch, J. J. |
Recent Results in B-Physics at e+e- Colliders
|
1993 |
Alexander, J. |
Superconducting Cavity Development for KEK B-Factory
|
1993 |
Mitsunobu, S. |
Bunch-by-Bunch Feedback for PEP II
|
1993 |
Ozoby, G. |
Recent IR Design Work for the KEK B Factory
|
1993 |
Satoh, K. |
Beam Behaviour and Luminosity Upgrades in BEPC
|
1993 |
Zhang, C. |
CESR/CLEO Phase-II IR Upgrade
|
1993 |
Yamamoto, H. |
Particle Identification via dE/dx in CLEO II
|
1993 |
Kinoshita, K. |
The Gismo Project
|
1993 |
Breakstone, A. |
Tracking System for KEK B-Factory
|
1993 |
Uno, S. |
Interference Effects in B-Decays to Flavor-Mixed Neutral Mesons Clues to Small Amplitudes and CP-Violation
|
1993 |
Lipkin, H. J. |
Recent Physics Results from BES
|
1993 |
Yu, Z. Q. |
Summary of the Detector Sessions
|
1993 |
Olsen, S. L. |
Results of Beam Physics Studies in CESR
|
1993 |
Rice, D. H. |
Beam Life Time from Beam-Beam Bremsstrahlung
|
1993 |
Funakoshi, J. |
Peripheral Collisions in KEK B-Factory
|
1993 |
Hirata, K. |
Test of Copper Duct at PF
|
1993 |
Kobayashi, M. |
Design of an Active Shield Dipole Magnet in the Interaction Region of KEK B-Factory
|
1993 |
Kobayashi, T. M. |
Trigger System for KEK B-Factory
|
1993 |
Sakai, Y. |
Triggering and Data Acquisition for a PEP II Detector
|
1993 |
Innes, W. R. |