OPTIMIZING AN INNOVATIVE GREEN INFRASTRUCTURE PROGRAM USING ASSET MANAGEMENT

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:WEFTEC connect (Veranstaltung : 2020 : Online) 93rd Water Environment Federation Technical Exhibition and Conference (WEFTEC 2020) ; Volume 6 of 6
1. Verfasser: Adams, L. (VerfasserIn)
Weitere Verfasser: Brown, K. (VerfasserIn)
Pages:93
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2021
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
IMPACT OF SHOCK ORGANIC LOADING RATES ON FOULING AND CLOGGING FREQUENCY OF MEMBRANE BIOREACTORS 2021 Alimoradi, S.
MANUAL AIR VALVE POSITIONING AND ENERGY USE TARIFFS IN ACTIVATED SLUDGE PROCESSES. IMPACTS ON OPERATING COSTS 2021 Reifsnyder, S.
DYNAMIC BLOWER DESIGN - USING MODELING TO ESTABLISH THE BLOWER OPERATING WINDOW UNDER VARYING LOADING SCENARIOS 2021 Schraa, O.
DECONTAMINATION OF PHARMACEUTICAL INDUSTRY WASTEWATER - TREATMENT OPTIONS AND BEST PRACTICES FOR TESTING AND DESIGN 2021 Ponitz, L.
PILOT STUDY ON EVALUATING TREATMENT OF CEC IN RO BRINE FROM HYBRID TREATMENT TRAIN PRODUCED WATER BY MICROBIAL FUEL CELL 2021 Shad, M. F.
DEVELOPMENT OF AN ENERGY SUSTAINABILITY PLAN FOR THE METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA 2021 Marcella, K.
HOLISTIC GRIT REMOVAL SYSTEM DESIGN LEADS TO REAL PERFORMANCE AND SAVINGS AT LARGE TEXAS WRRF 2021 Sober, J.
NEXT STEPS: SECONDARY CLARIFICATION DESIGN AND OPERATION AS THE RESULT OF AEROBIC GRANULATION 2021 Redmond, E.
TO INSPECT OR NOT TO INSPECT: WHICH PIPELINE IS FIRST? 2021 Carolan, J.
DOES YOUR FACILITY ACTUALLY NEED SIDESTREAM AMMONIA REMOVAL? THE iC SCIENCE AND TWO CASE STUDIES 2021 Dapcic, A.
OPTIMIZING AN INNOVATIVE GREEN INFRASTRUCTURE PROGRAM USING ASSET MANAGEMENT 2021 Adams, L.
ADVANCES IN STORMWATER CONDITION ASSESSMENT AND INVENTORY METHODOLOGIES FOR RESILIENCY, SPEED, AND ACCURACY 2021 Elliott, D.
WELLINGTON WATER'S APPLICATION OF ARTIFICIAL INTELLIGENCE FOR ALL WASTEWATER INFRASTRUCTURE PLANNING 2021 Faulkner, A.
GOING BUBBLELESS: MABR TECHNOLOGY FULL-SCALE DEMONSTRATION AT EJBY MOLLE WRRF 2021 Constantine, T.
EFFECTS OF PREDATION ON NITRIFYING MEMBRANE-AERATED BIOFILM REACTORS 2021 Kim, B.
HIGH RATE AMMONIA REMOVAL IN SIDE STREAM TREATMENT WITH MABR: LAB AND PILOT RESULTS 2021 Shechter, R.
TREATABILITY TESTING AND DESIGN OF UNIQUE BIOREACTOR FOR LEACHATE ODOR 2021 Pugh, L.
PUTTING THE SCREWS ON NON-STABILIZED WAS — A KIWI EXPERIENCE 2021 Macdonald, G.
PERFORMANCE OF A FULL SCALE MBBR SYSTEM FOR BIOLOGICAL REMOVAL OF COMPLEX NITROGEN COMPOUNDS (CYANIDE, THIOCYANATE AND AMMONIA) FROM A CYANIDE DETOXIFICATION EFFLUENT AT A GOLD MINE 2021 Dale, C.
UTILITY AND UNIVERSITY PARTNERSHIPS FOR SMALL AND MID-SIZE UTILITIES — A RELATIONSHIP WORTH PURSUING 2021 Morris, L.
Alle Artikel auflisten