FEASIBLE SCR CONFIGURATION FROM FPSO WITH LARGE MOTIONS, BY APPLYING RESIDUAL CURVATURE METHODS
|
2021 |
Ramiro, Andre Amorim |
LATERAL BUCKLING MITIGATION IN DEEP WATERS - A TOTAL INSTALLED COSTS COMPARISON
|
2021 |
Priyadarshi, Hemant |
QUALIFICATION OF POLYMER MATERIALS FOR DYNAMIC RISER SERVICE
|
2021 |
McCord, Craig |
THE WORLD DEEPEST ELECTRICALLY HEAT-TRACED FLOWLINE
|
2021 |
Ligny, Florent Hurault De |
A NEW FUNDAMENTAL UNDERSTANDING OF GAS IN THE DRILLING RISER
|
2021 |
Leach, Colin |
DIGITAL TWIN FOR OFFSHORE PIPELINE CORROSION MONITORING: A DEEP LEARNING APPROACH
|
2021 |
Bhowmik, Subrata |
DECOMMISSIONING OFFSHORE STRUCTURES BY EXTRACTION OF FOUNDATION MONO PILES APPLYING A VIBRATORY HAMMER
|
2021 |
Dorp, Rob Van |
SOLVING DECOMMISSIONING AND ABANDONMENT PROBLEMS WHEN PLANNING TO SHEAR 9 5/8-INCH CASING IN A 13 5/8-INCH × 10K RAM BOP
|
2021 |
Cain, David Earl |
THE AUTONOMOUS INFLOW CONTROL VALVE DESIGN AND EVALUATION CRITERIA ALONG WITH WELL PERFORMANCE REVIEW FOR MULTIPLE INSTALLATIONS ACROSS THE GLOBE
|
2021 |
Kalyani, Tejas |
DEVELOPMENT AND TRIAL OF TECHNOLOGY FOR OPEN HOLE WELLS PERFORMANCE ENHANCEMENT IN GOM
|
2021 |
Peixoto, Luis |
FLEXIBLE PIPES SUBJECTED TO SCC CO2: REVIEW AND MEANS TO INCREASE RELIABILITY ON SERVICE LIFE APPLIED TO BRAZILIAN PRE-SALT FIELDS
|
2021 |
Brandao, Mauricio |
INSPECTTM COMPUTED TOMOGRAPHY FOR NDT OF SUBSEA PIPELINES
|
2021 |
Pettigrew, Irene Grant |
COMPREHENSIVE APPROACH TO TACKLE SYSTEMIC FAILURE IN GAS LIFT VALVES IN PRE SALT WELLS
|
2021 |
Real, Elaine Daniele M. P. C. |
EXPERIENCE WITH CHEMICAL INJECTION AND UMBILICALS IN PRE-SALT FIELDS
|
2021 |
Silva, Sidnei Guerreiro Da |
VERTICAL TO HORIZONTAL - ULTRA DEEP AZIMUTHAL RESISTIVITY TOOL UDAR SERVICE HELPING TO MAXIMIZE PRODUCTION
|
2021 |
Sedeq, Ahmed Zarroug El |
NEXT GENERATION HIGH-DEFINITION GEOMAGNETIC MODEL FOR WELLBORE POSITIONING, INCORPORATING NEW CRUSTAL MAGNETIC DATA
|
2021 |
Nair, Manoj |
TRIPLE MPD TECHNIQUE FOR DRILLING AND INTELLIGENT COMPLETION DEPLOYMENT ON AN ABANDONED DEEPWATER WELL
|
2021 |
Fernandes, André Alonso |
TROLL PHASE 3: THE NEXT STEP FOR A GROUNDBREAKING GIANT
|
2021 |
Laastad, Bjørn |
COST-EFFECTIVE UPGRADES OF DRILLING RISERS TO 20,000 PSI APPLICATIONS THROUGH COMPOSITE-REINFORCED STEEL CHOKE AND KILL LINES
|
2021 |
Persent, Emmanuel |
NOVEL THOR TECHNOLOGY FOR ORIENTATION OF VERTICAL XT TO COMPLETIONS
|
2021 |
Katsounas, Nicholas Paul |