Island Barn Reservoir — Embankment Leakage remedial works

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:British Dam Society (20. : 2018 : Swansea) Smart dams and reservoirs
1. Verfasser: RETTURA, D. M. (VerfasserIn)
Weitere Verfasser: ALESSANDRINI, M. (VerfasserIn), ABEYWICKRAMA, L. (VerfasserIn), GREEN, J. (VerfasserIn), PHILPOTT, B. (VerfasserIn)
Format: UnknownFormat
Sprache:eng
Veröffentlicht: 2018
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Titel Jahr Verfasser
The Environmental Permitting of a new mine waste facility in Devon 2018 CAMBRIDGE, M.
Island Barn Reservoir — Embankment Leakage remedial works 2018 RETTURA, D. M.
CFD modelling for engineering solution optimisation on the Usk Reservoir 2018 MEHTA, J.
Comparison of shear-beam and dynamic finite-element modal analysis of earth dams 2018 LO, E.
Safeguarding critical infrastructure against landslip risk on a large dam in Albania 2018 BLOWER, T.
Trebeddrod — A case study on the construction of a small spillway at a constrained site 2018 COOPER, M.
Intelligent rollers for embankment dam construction 2018 DOOLEY, B. C.
The automation of data collection at Clywedog Dam, Wales 2018 BRUGGEMANN, D. A.
The use of Thermal Imaging Cameras for everyday Site Inspections 2018 ROBSON, R. J.
Improving the emergency drawdown reliability at Llyn Brenig reservoir 2018 TUDOR, S.
Loch Thom: Ground Investigation and Preliminary Results from Jet Erosion Testing (JET) 2018 HAMILTON, L.
Building dams on rock or soft soil — frequency-domain analysis of dynamic dam-foundation interaction 2018 LO, E.
The Ultimate Dam Revisited 2018 THOMPSON, A. N.
Killington Reservoir, a historic structure — spillway refurbishment in 2017 2018 BROWN, D. H.
Fuse-plug Spillways 2018 HINKS, J. L.
First underwater installation of a geomembrane system in a UK dam: Llyn Teifi spillway 2018 VASCHETTI, G.
A risk-based approach for assessing a flood discharge for the design of river diversion structures 2018 MALIZDERSKYI, R.
Smart Construction Monitoring of Dams With UAVS - Neckartal Dam Water Project Phase 1 2018 COETZEE, G. L.
Smart membranes and pipe monitoring networks; waterproofing and real-time leak detection systems 2018 CROWTHER, J.
Improvements in Reservoir Flood Mapping as part of the Environment Agency’s Flood Map Project 2018 DEANE, M.
Alle Artikel auflisten